Reliability Based On Evaluation of Insulation and Mechanical Conditions of Step-Lp Transformers of Guri Power Plant at CVG EDELCA in Venezuela

机译:基于评估委内瑞拉CVG Edelca Guri Power Plance Step-LP变压器绝缘和机械条件的可靠性

获取原文

摘要

For CVG EDELCA, reliability of power transformers is a very important matter for its power system performance. Taking in consideration that at Guri Hydro Power Plant there are power transformers older than twenty years old, it was decided to select a group of step-up transformers for evaluation of insulation and mechanical conditions based on: dissolved gas analysis (DGA), tests of oil, and electric tests, for the last five years. Due to an incipient fault condition detected by DGA, a program of off-line tests on a group of three-phase and single-phase transformers of Guri Power Plant was scheduled in cooperation with Hydro Quebec International experts. Frequency response stray losses, frequency response analysis, recovered voltage measurement and dissipation factor versus frequency tests were applied on each selected transformer. As a result of the investigation, it was found that mechanical and insulation conditions were good for most of these transformers.
机译:对于CVG Edelca,电力变压器的可靠性是其电力系统性能的非常重要的问题。考虑到在Guri Hydro Power Plation,有超过二十岁的电力变压器,决定选择一组升压变压器,用于评估绝缘和机械条件,基于:溶解气体分析(DGA),测试石油和电动试验,过去五年。由于DGA检测到的初始故障条件,与水电魁北克国际专家合作,安排了一组三相和单相变压器的一组三相和单相变压器的离线试验节目。频率响应杂散损耗,频率响应分析,回收的电压测量和耗散因子与频率测试施加在每个选定的变压器上。由于调查,发现机械和绝缘条件适合大多数这些变压器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号