A Case Study of Breaker Failure During Simultaneous Single-Line-to-Ground Faults on a Parallel Circuit

机译:并联电路同时单行故障在同步单线故障期间断路器故障的案例研究

获取原文

摘要

This paper analyzes two breaker failure events of which simultaneous single-phase-to-ground faults on a double circuit line caused re-striking of one line's faulted phase interrupter. The short-line faults occurred twice at nearly identical locations approximately one year apart causing failure each time of a 161kV, 40kA circuit breaker. The fault current of both events was less than ten percent of the maximum interrupting current capability of both circuit breakers. This paper discusses both incidents, the analysis to determine the root cause of failure, and the solution to mitigate reoccurrence.
机译:本文分析了两台断路器故障事件,在双电路线上的同时单相对地故障导致重新引起一行的断层相位断路器。短线故障发生两次在几乎相同的位置,大约一年的一年,例如每次161kV,40kV,40kA断路器的失效。两种事件的故障电流低于两个断路器的最大中断电流能力的百分比。本文讨论了事件,分析来确定失败的根本原因,以及减轻再循环的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号