BENCHMARK STUDY OF THE ACCIDENT AT THE FUKUSHIMA DAIICHI NPS BEST ESTIMATE CASE COMPARISON

机译:FUKUSHIMA DAIICHI NPS最佳估计病例比较中的事故征候基准研究

获取原文

摘要

The Great East Japan earthquake, occurred on March 11th 2011 at 14:46, and the subsequent tsunami led the TEPCO's Fukushima Daiichi Nuclear Power Station (NPS) to endure beyond design basis accident. After the accident, the Japanese government and TEPCO compiled the roadmap towards an early resolution to the accident including, among the main activities, the employment and development of severe accident (SA) computer codes. In the member countries of the Organization for Economic Cooperation and Development, Nuclear Energy Agency (OECD/NEA), SA codes have been developed after the accident at the Three Mile Island Unit 2 and widely employed to asses NPS status in the postulated SA conditions. Therefore, the working plans have been set up to conduct a benchmark study of the accident for the Fukushima Daiichi NPS units 1-3 with the country members of the OECD/NEA, using SA codes, constituting an international program named Benchmark Study of the Accident at the Fukushima Daiichi Nuclear Power Station (BSAF). The objectives of the BSAF project are: to analyze the accident progression of Fukushima Daiichi NPS, to raise the understanding of SA phenomena, to contribute to the improvements of methods and models of the SA codes and to define the status of debris distribution in the reactor pressure vessels and primary containment vessels for decommissioning. The present technical paper summarizes the achievements obtained through the results' comparison, emphasizing the portions of the accident where all the participants reached a common consensus and identifying still open questions where future work should be directed. Consensus exists on the current condition of the Unit 1, where a large fraction of the fuel is assumed to have relocated ex-vessel. On the other hand larger uncertainties exist for Units 2 and 3 where in-vessel and ex-vessel scenarios produce a reasonable prediction of the accident progression.
机译:大东日本地震发生,2011年3月11日在14:46发生,随后的海啸带领Tepco的福岛帝茶核电站(NPS)忍受超越设计基础事故。事故发生后,日本政府和TEPCO将路线图归结为事故的早期决议,包括严重事故(SA)计算机代码的主要活动,就业和发展。在经济合作与发展组织的成员国,核能机构(OECD / NEA),在三英里岛屿单元2的事故发生后,SA代码已开发,并广泛用于遵守假设的SA条件下的NPS状态。因此,已经建立了工作计划,以便使用SA代码与经合组织/ NEA的国家成员进行福岛Daiichi NPS单位1-3事故的基准研究,这是一项名为事故的基准研究的国际计划在福岛达奇核电站(BSAF)。 BSAF项目的目标是:分析福岛Daiichi NP的事故进展,提高对SA现象的理解,为改进SA代码的方法和模型以及定义反应堆中的碎片分布状态压力容器和初级容纳血管退役。本文技术论文总结了通过结果的比较获得的成就,强调所有参与者达成共同共识的事故的一部分,并识别应在未来工作所需的仍然开放的问题。存在于单元1的当前条件上的共识,其中假设大部分燃料具有重新定位的前容器。另一方面,单位2和3存在较大的不确定性,其中包括船舶和前血管场景产生了对事故进展的合理预测。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号