首页> 外文会议>Pipelines conference >Alternative Construction Methods and Pipe Material Provide Solutions for Cleveland WWTP Project
【24h】

Alternative Construction Methods and Pipe Material Provide Solutions for Cleveland WWTP Project

机译:克利夫兰污水处理厂项目的替代施工方法和管道材料提供解决方案

获取原文

摘要

The Easterly Wastewater Treatment Plant (WWTP), located on the northeast side of Cleveland between Lakeshore Boulevard and Lake Erie, provides wastewater treatment services for 334,000 residents and various businesses in northeastern Cleveland and the surrounding suburbs. In addition to treating wastewater from homes and businesses, the Easterly WWTP also receives and treats stormwater from combined sewers. Over 94 million gallons of wastewater per day (mgd) are treated at the Easterly WWTP. The Northeast Ohio Regional Sewer District (NEORSD) awarded the contract to Shook Walbridge Joint Venture. The Sustained Secondary Improvements Project includes expanding the Easterly Wastewater Treatment Plant's 330 MGD capacity to 400 MGD. The project included improvements to the plant's existing aeration tanks and final settling tanks, construction of six additional final settling tanks, improve hydraulics to support the capacity increase, and implement various miscellaneous improvements. More specifically, as part of the improvements, the project required auger-cast-piles to support new structure foundations, but also to support pipe cradles for the final effluent piping. These piles were part of the original design to support the 60", 72" and 84" diameter effluent pipe, which was designed with Prestressed Cylinder Concrete Pipe (PCCP). As a way to solve some constructability issues, Shook-Walbridge proposed a pipe material and pipe foundation substitution in lieu of the PCCP pipe and auger-cast-piles. Their substitution included the use for large diameter fiberglass pipe along with a continuous concrete ballast slab to address floatation concerns. As part of the substitution review process, various aspects of the alternative installation method had to be reviewed prior to acceptance of this alternative. This paper will review the different key components considered during the substitution review process.
机译:东风污水处理厂(WWTP)位于克利夫兰东北部,在湖岸大道和伊利湖之间,为克利夫兰东北部及周边郊区的334,000名居民和各行各业提供污水处理服务。除了处理来自家庭和企业的废水外,东风污水处理厂还接收并处理来自下水道的雨水。东风污水处理厂每天处理超过9400万加仑的废水(mgd)。俄亥俄州东北部地区下水道区(NEORSD)将合同授予了Shook Walbridge合资企业。持续二级改进项目包括将东风污水处理厂的330 MGD产能扩大到400 MGD。该项目包括改进工厂现有的曝气池和最终沉降池,建造六个额外的最终沉降池,改善液压系统以支持容量增加以及实施各种其他改进。更具体地说,作为改进的一部分,该项目需要螺旋钻桩来支撑新的结构基础,还需要为最终的污水管道支撑管道支架。这些桩是用于支撑直径为60“,72”和84“的污水管的原始设计的一部分,该污水管是采用预应力圆柱混凝土管(PCCP)设计的。作为解决某些可施工性问题的一种方法,Shook-Walbridge提出了一种管子替代PCCP管道和螺旋钻桩的材料和管道基础替代,包括使用大直径玻璃纤维管道以及连续的混凝土压舱板来解决浮选问题,作为替代审查过程的一部分,各个方面在接受替代方案之前,必须先对替代方案的安装方法进行审查,本文将对替代方案审查过程中考虑的不同关键组件进行审查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号