Due to a series of high impact failures of prestressed concrete cylinder pipe (PCCP) in its water distribution system, the Washington Suburban Sanitary Commission (WSSC) has developed an aggressive program of field condition assessment to identify pipes in danger of failure. However, it found that it was not able to apply these techniques to the two parallel PCCP pipes located within its primary water treatment facility, the Potomac Water Filtration Plant, because the flow demands would not permit the existing 78-inch line to be removed from service for condition assessment. A Business Case evaluation was convened to develop and compare alternatives for installing a full capacity redundant transmission line to carry finished water from the plant, which was complicated by the severely congested nature of the facility, which had grown and been added to multiple times in its history. The alternatives were evaluated using Triple Bottom Line techniques for cost, societal and environmental impacts. Alternatives considered included a tunnel, multiple near surface alignments, and pump station reconfigurations, plus the "No Action" and "Status Quo" options.
机译:由于预应力混凝土圆筒管(PCCP)在其配水系统中发生了一系列高冲击故障,华盛顿市郊区卫生委员会(WSSC)已制定了一项积极的现场条件评估计划,以识别存在故障危险的管道。但是,它发现无法将这些技术应用于位于其主要水处理设施波托马克水过滤厂内的两条平行PCCP管道,因为流量需求不允许将现有的78英寸管线从中移除。状况评估服务。召集了业务案例评估,以开发和比较安装全容量冗余传输线以从工厂输送成品水的替代方案,而这又由于设施的严重拥挤而变得复杂,该设施已经发展壮大,并在其设施中多次添加历史。使用三重底线技术评估了替代方案对成本,社会和环境的影响。考虑的替代方案包括隧道,多个近地面对齐和泵站重新配置,以及“无操作”和“状态”选项。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号