The existing BNSF Bridge 294.1 consisted of two 48" deck plate girder spans and three 124' through truss spans and was being replaced with an in-line replacement bridge consisting of two 39' double cell concrete spans, two 62' deck plate girder spans and three 127' through plate girder spans supported by CIP or precast concrete caps and drilled shafts. The construction plan for the in-line replacement of this bridge occurred during a specified track window that included placement of a causeway across the Salt Fork River originally set for October. OCCI chose to use Self Propelled Modular Transport's (SPMT) for both the removal and replacement of the bridge components. The existing truss spans were lifted by crane and placed on the waiting SPMT, then transported to the staging area one at a time where they were removed and replaced by the new TPG spans that were then transported back to the bridge and lifted into place by the cranes. With scheduling changes, the track window ended up occurring the weekend of January 4, 2014. The winter climate brought its own challenge, with a 24 hour wind delay where the temperature dropped from 40 degrees to 0 with winds over 30 mph in which the cranes could not safely lift the loads. TranSystems, the OCCI and BNSF worked together to find multiple alternatives to replace the remaining spans to get the bridge back in service if these conditions continued. As a successful result of these efforts, trains were placed on the new bridge by 6 am Monday morning.
机译:现有的BNSF桥294.1由两个48英寸桥面板跨度和三个124'贯穿桁架跨度组成,并被替换为由两个39'双格混凝土跨度,两个62'桥面板跨度和由CIP或预制混凝土帽盖和钻孔轴支撑的三个127'贯穿板梁跨度。在指定的轨道窗期间进行了桥梁的在线更换的施工计划,其中包括在盐田河上原先设置的堤道位置十月,OCCI选择使用自行式模块化运输工具(SPMT)来拆除和更换桥梁组件,并用起重机将现有的桁架跨度提升并放置在等待的SPMT上,然后一次运至登台区域。他们被拆除,取而代之的是新的TPG跨距,然后又被运回桥上并由起重机吊装到位。冬季气候给2014年1月4日的周末带来了挑战,风速延迟了24小时,风速超过30 mph时,温度从40度降至0,导致起重机无法安全地吊起负载。 TranSystems,OCCI和BNSF共同努力寻找多种替代方案,以替换剩余的跨度,以便在这些情况持续的情况下使桥重新投入使用。这些努力的成功结果是,星期一早上6点之前,火车就安装在了新桥上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号