首页> 外文会议>AIAA space and astronautics forum and exposition >The OCO-2 Validation Matrix: A Systematic Approach to Mission Validation
【24h】

The OCO-2 Validation Matrix: A Systematic Approach to Mission Validation

机译:OCO-2验证矩阵:任务验证的系统方法

获取原文

摘要

The Orbiting Carbon Observatory (OCO-2) mission was launched on July 2nd 2014 on the first of the last set of Delta II rockets from Vandenberg Air force Base. It is currently operating in the A-train and collecting data that will help scientists to understand the global carbon cycle. As with all NASA missions the OCO-2 mission went through a rigorous V&V (Verification and Validation) program. The program used the DOORS (Dynamic Object Oriented Requirements System) tool to implement a verification matrix complete with detailed verification activities that were used to accept the associated requirements as verified. On the other side of V&V is validation, and there are several methods that can be taken to construct a validation plan, unfortunately, few provide the ease and simplicity of the verification matrix used on OCO-2. In addition it is almost impossible to know conclusively that your system is fully validated until it is operating in space. In order to better prioritize the validation program of the OCO-2 mission the OCO-2 project V&V team developed and utilized a "validation matrix". This matrix was used to help focus the OCO-2 ORTs (Operational Readiness Tests) and other validation testing on specific objectives and to optimize other tests as needed. While not all of the objectives identified in the matrix were closed during the ORTs it did provide the V&V team a method by which they could feel confident that the operations team, processes and procedures and the spacecraft observatory were ready for launch & operations. In this paper we will discuss the process used for developing the OCO-2 validation matrix, and how it was used in practice during the OCO-2 testing program.
机译:轨道碳天文台(OCO-2)任务于2014年7月2日发射,这是范登堡空军基地最后一批Delta II火箭中的第一套。它目前正在A列火车上运行,并正在收集有助于科学家了解全球碳循环的数据。与所有NASA任务一样,OCO-2任务也经过严格的V&V(验证和确认)程序。该程序使用DOORS(面向动态对象的需求系统)工具来实现一个验证矩阵,其中包含用于接受已验证的相关要求的详细验证活动。 V&V的另一面是验证,可以采用多种方法来构建验证计划,但不幸的是,很少有方法可以简化和简化OCO-2上使用的验证矩阵。此外,几乎不可能最终确定您的系统在太空中运行之前已经过全面验证。为了更好地确定OCO-2任务的验证程序的优先级,OCO-2项目V&V团队开发并利用了“验证矩阵”。该矩阵用于帮助将OCO-2 ORT(操作准备测试)和其他验证测试的重点放在特定目标上,并根据需要优化其他测试。虽然并不是在ORT期间就确定了矩阵中确定的所有目标,但确实为V&V团队提供了一种方法,使他们可以确信操作团队,流程和程序以及航天器天文台已准备就绪,可以进行发射和操作。在本文中,我们将讨论用于开发OCO-2验证矩阵的过程,以及在OCO-2测试程序中如何在实践中使用它。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号