首页> 外文会议>Low impact development conference >Innovative Design of the Gravel System for Underground Parking Garage
【24h】

Innovative Design of the Gravel System for Underground Parking Garage

机译:地下停车场碎石系统的创新设计

获取原文

摘要

This study discusses the innovative design of the gravel infiltration retention system for underground parking garage of the Phases 5 & 6 Project of the Hills in Panyu District, Guangzhou City. The runoff from this project site is mainly managed by an innovative subsurface detention gravel system that provides stormwater storage during storm event and irrigation reuse during the dry season. This gravel infiltration retention system is generally provided by a 20cm layer of coarse gravel placed over the garage under the landscaping soil surrounding the buildings. The areas not treated by the gravel infiltration retention system will be treated by a bioswale and a rain garden designed to remove nutrient. The synthetic 133mm 4-hour storm event with 10 year return period was used to design the gravel infiltration retention system, rain garden, bioswale and other pipeline conveyance. The 24 hour historical rainfall of 389mm was used to evaluate these low impact development facilities responses to an extreme event. The simulation results show that the gravel infiltration retention system have very large flood control performance.
机译:本研究讨论了广州市番yu区丘陵五期和六期工程地下停车场砾石入渗保留系统的创新设计。该项目工地的径流主要由创新的地下滞留砾石系统管理,该系统在暴风雨期间提供雨水储存,在旱季提供灌溉再利用。这种砾石渗透保持系统通常由放置在车库周围建筑物周围的美化土壤下的20cm的粗砾石层提供。未经过砾石渗透保留系统处理的区域将通过生物泥水和旨在去除养分的雨林进行处理。合成的133mm 4小时暴风雨事件,具有10年的返回期,用于设计砾石渗透保持系统,雨林,生物流和其他管道输送。 24小时的389mm历史降雨量用于评估这些低影响的开发设施对极端事件的响应。仿真结果表明,砾石入渗保留系统具有很大的防洪性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号