首页> 外文会议>Low impact development conference >Innovative Design of the Gravel System for Underground Parking Garage
【24h】

Innovative Design of the Gravel System for Underground Parking Garage

机译:地下停车库砾石系统的创新设计

获取原文

摘要

This study discusses the innovative design of the gravel infiltration retention system for underground parking garage of the Phases 5 & 6 Project of the Hills in Panyu District, Guangzhou City. The runoff from this project site is mainly managed by an innovative subsurface detention gravel system that provides stormwater storage during storm event and irrigation reuse during the dry season. This gravel infiltration retention system is generally provided by a 20cm layer of coarse gravel placed over the garage under the landscaping soil surrounding the buildings. The areas not treated by the gravel infiltration retention system will be treated by a bioswale and a rain garden designed to remove nutrient. The synthetic 133mm 4-hour storm event with 10 year return period was used to design the gravel infiltration retention system, rain garden, bioswale and other pipeline conveyance. The 24 hour historical rainfall of 389mm was used to evaluate these low impact development facilities responses to an extreme event. The simulation results show that the gravel infiltration retention system have very large flood control performance.
机译:本研究讨论了广州市番禺区山丘5&6项目的地下停车库砾石渗透保留系统的创新设计。来自该项目网站的径流主要由创新的地下拘留砾石系统管理,在旱季期间提供雨水储存和灌溉重复使用。该砾石渗透保持系统通常由20cm层提供放置在建筑物周围的园林绿化土壤上的车库上的20cm层。由砾石渗透保留系统未治疗的区域将由Bioswale和雨凉花园进行处理,旨在去除营养素。合成133mm 4小时风暴事件,10年回报期用于设计砾石渗透保留系统,雨水花园,BIOSWALE等管道输送。 389毫米的24小时历史降雨量用于评估这些低影响的开发设施对极端事件的反应。仿真结果表明,砾石渗透保留系统具有非常大的防洪性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号