Experimental Study on Precast Beam Column Connections Constructed Using RC Corbel and Steel Billet under Progressive Collapse Scenario

机译:渐进倒塌情景下RC牛腿和钢坯构建预制梁柱连接的试验研究

获取原文

摘要

Progressive collapse denotes a failure of a major portion of a structure that has been initiated by failure of a relatively small part of the structure such as failure of any vertical load carrying element (typically columns). Failure of large part of any structure will results in to substantial loss of human lives and natural resources. Therefore, it is important to prevent progressive collapse which is also known as disproportionate collapse. Now a days, there is increasing trend towards construction of buildings using precast concrete. In precast concrete construction, all the components of structures are produced in controlled environment and they are being connected appropriately at site. Connections are the most critical elements of any precast structure, because in past major collapse of precast structure took place because of connection failure. In this study, behavior of four different reduced 1/3rd scaled precast specimens having wet and dry connections is investigated under column removal scenario and their performance is compared with monolithic connection. Precast specimens considered for the study are constructed by adopting different detailing having column with RC corbel and column with steel billet for connection with precast beam. Performance of specimen is evaluated on the basis of ultimate load carrying capacity, maximum deflection and deflection measured along the span of the beam. From the results, better performance of precast connections is observed up to elastic phase but later on strength of dry precast connections degrades more as compared to monolithic connection. Wet precast connections exhibit superior performance as compared to monolithic connection, which advocates replacement of monolithic connection with appropriate connection detailing. From the results, is also observed that precast connections constructed using RC corbel performs better as compared to those constructed using steel billet.
机译:渐进式塌陷表示结构主要部分的破坏,该破坏是由结构的相对较小部分的破坏(例如任何垂直承载元素(通常为圆柱)的破坏)引发的。任何结构的大部分故障都将导致人员生命和自然资源的大量损失。因此,重要的是防止进行性塌陷,也称为不成比例的塌陷。如今,使用预制混凝土建造建筑物的趋势越来越大。在预制混凝土施工中,结构的所有组件均在受控的环境中生产,并且已在现场进行了适当的连接。连接是任何预制结构中最关键的元素,因为在过去,由于连接失败,导致预制结构发生了重大崩溃。在这项研究中,研究了在去除色谱柱的情况下,四个具有湿连接和干连接的不同的缩小1/3比例缩小的预制标本的行为,并将其性能与整体连接进行了比较。考虑用于研究的预制试样是通过采用不同的细节构造而成的,其中带有RC牛腿的立柱和带有钢坯的立柱与预制梁连接。根据极限承载力,最大挠度和沿梁跨度测得的挠度评估试样的性能。从结果可以看出,在弹性阶段之前,预制连接的性能更好,但与单片连接相比,干式预制连接的强度随后下降的更多。与整体式连接相比,湿式预制连接表现出优越的性能,后者主张用适当的连接细节代替整体式连接。从结果还可以看出,与使用钢坯建造的预制连接相比,使用RC牛腿建造的预制连接性能更好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号