...
首页> 外文期刊>Engineering Structures >Strengthening of precast RC beam-column connections for progressive collapse mitigation using bolted steel plates
【24h】

Strengthening of precast RC beam-column connections for progressive collapse mitigation using bolted steel plates

机译:加固预制RC梁柱连接,以使用螺栓连接的钢板逐步缓解坍塌

获取原文
获取原文并翻译 | 示例

摘要

Being one of the most critical scenarios in extreme events such as blast attacks, the progressive collapse of reinforced concrete (RC) structures has attracted the attention of structural engineering community. As precast concrete buildings are deficient in structural continuity, they are more vulnerable to progressive collapse than cast-in-situ RC buildings. Hence, effective rehabilitation techniques to upgrade beam-column joints in existing precast RC buildings for progressive collapse mitigation are needed. The goal of this study is to investigate the effectiveness of using bolted steel plates on the behavior of precast beam-column connections under sudden column-loss scenario. This study presents experiments involving one half-scale precast RC beam-column assembly, which represented the most prevalent types of existing precast beam-column joints in Saudi Arabia. One monolithic test specimen having continuity of top and bottom beam rebars was used for the sake of comparison. Another precast specimen similar to the control one was strengthened using bolted steel plates within the connection region. The progressive collapse scenario was simulated by removing the central column support and applying a sudden vertical load on this column at a rate of 100 mm/s until failure. The collapse load of both monolithic and strengthened specimens was predicted using a simplified section analysis procedure. The analysis was then used for some useful parametric studies in which the effect of different steel plate parameters on the response of test frames under middle column-loss scenario was investigated.
机译:作为爆炸等极端事件中最关键的情况之一,钢筋混凝土(RC)结构的逐渐倒塌引起了结构工程界的关注。由于预制混凝土建筑物的结构连续性不足,因此它们比现浇的RC建筑物更容易遭受逐渐倒塌的破坏。因此,需要有效的修复技术来升级现有预制RC建筑物中的梁柱节点,以逐步缓解坍塌。这项研究的目的是研究在突然的柱损情况下使用螺栓连接钢板对预制梁柱连接行为的有效性。这项研究提出的实验涉及一个半比例的预制RC梁柱组件,代表了沙特阿拉伯现有的预制梁柱节点的最普遍类型。为了比较,使用了具有顶梁和底梁钢筋的连续性的一个整体试样。在连接区域内使用螺栓连接的钢板加固了另一个与对照组相似的预制试样。通过移除中心柱支撑并以100 mm / s的速率在此柱上施加突然的垂直载荷,直至失效,来模拟渐进倒塌的情况。使用简化的截面分析程序可以预测整体和加强试样的破坏荷载。然后,该分析用于一些有用的参数研究,其中研究了在中柱损失情况下不同钢板参数对测试框架响应的影响。

著录项

  • 来源
    《Engineering Structures 》 |2018年第15期| 146-160| 共15页
  • 作者单位

    King Saud Univ, Coll Engn, Dept Civil Engn, Chair Res & Studies Strengthening & Rehabil Struc, POB 800, Riyadh 11421, Saudi Arabia;

    King Saud Univ, Coll Engn, Dept Civil Engn, Chair Res & Studies Strengthening & Rehabil Struc, POB 800, Riyadh 11421, Saudi Arabia;

    King Saud Univ, Coll Engn, Dept Civil Engn, Chair Res & Studies Strengthening & Rehabil Struc, POB 800, Riyadh 11421, Saudi Arabia;

    King Saud Univ, Coll Engn, Dept Civil Engn, Chair Res & Studies Strengthening & Rehabil Struc, POB 800, Riyadh 11421, Saudi Arabia;

    King Saud Univ, Coll Engn, Dept Civil Engn, Chair Res & Studies Strengthening & Rehabil Struc, POB 800, Riyadh 11421, Saudi Arabia;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Strengthening; Steel plates; Progressive collapse; Precast beam-column connection; Column removal scenario;

    机译:加固;钢板;渐进倒塌;预制梁柱连接;拆除柱子的情况;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号