The city of Largo, Florida, with of approximately 85,000 residents, recently completed a $38 million wastewater collection system improvements project to eliminate sanitary sewer overflows (SSOs) that had regularly occurred following significant rain events. This Wet Weather Monitoring and Pumping System Project, involved construction of approximately 14.2 miles of sanitary force mains and the reconstruction and upgrade of seven pump stations. Following prequalifications and value engineering negotiations with the selected contractor, the project was awarded in early 2015 and placed into service in late 2016. One of the key challenges facing this project was the construction of a new force main traversing the city from east to west through urban and residential rights-of-way with dense utilities and multiple roadway and waterway crossings. Force main piping ranged from 12-inch to 30-inch diameter, of ductile iron and polyvinyl chloride construction, with installation by open cut, horizontal directional drilling (HDD), and jack and boring. Necessitated by wetlands and Florida Department of Transportation (FDOT) road crossings, roadway and driveway impacts, residential encroachment onto easements, and crowded utility/drainage corridors, twenty-five (25) separate HDDs were included in the pipeline route, totaling 5.6 miles of the pipeline—using fused polyvinyl chloride pipe (FPVCP). Drill design was based on pipe material selection, entry and exit location availability, layout and pullback requirements, bore path tracking capabilities, and geotechnical conditions. Details of individual drills are discussed, as well as significant issues experienced during construction, such as frac-outs, drilling mud management, and bore path tracking. The incorporation of trenchless methodologies such as horizontal directional drilling and jack and boring allowed the project to be completed successfully, with significantly less impact to the community and environment than open-cut options. The final product will reduce sanitary sewer overflows in the city of Largo for many years to come.
机译:佛罗里达州的Largo(佛罗里达州)大约85,000名居民,最近完成了3800万美元的污水收集系统改进项目,以消除经常发生在大量雨季事件之后经常发生的卫生下水道溢出(SSO)。这种潮湿的天气监测和泵送系统项目,涉及建造约14.2英里的卫生力源和七个泵站的重建和升级。随着所选承包商的预核化和价值工程谈判,该项目于2015年初颁发,并于2016年底纳入服务。该项目面临的关键挑战之一是建设一支新的力量主要遍历东部到西部城市与密集的公用事业和多个巷道和水路交叉的城市和住宅权利。迫使主管道范围为12英寸至30英寸直径,球墨铸铁和聚氯乙烯结构,安装通过开口切割,水平定向钻孔(HDD)和千斤顶和镗孔。湿地和佛罗里达州的交通部(弟佛罗里达交通部(电器)的道路交叉口,巷道和车道冲击,住宅侵占到役,以及拥挤的公用事业/排水走廊,二十五(25)个单独的硬盘被列入管道路线,总计5.6英里管道使用熔融聚氯乙烯管(FPVCP)。钻孔设计基于管材材料选择,进入和退出位置可用性,布局和回车要求,钻孔路径跟踪能力和岩土工程。讨论了个别钻头的细节,以及在建筑过程中经历的重大问题,例如Frac-Outs,钻井泥浆管理和钻孔路径跟踪。结合水平定向钻孔和千斤顶等挖沟方法,允许该项目成功完成,对社区和环境的影响明显不那么少于开放选项。最终产品将减少卫生下水道在洛加市溢出多年来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号