首页> 外文会议>Pipelines conference >Condition Assessment of Aging, Hard to Access Sewer Mains
【24h】

Condition Assessment of Aging, Hard to Access Sewer Mains

机译:衰老的条件评估,难以进入下水道主电源

获取原文

摘要

Of the 1,300 miles of sanitary sewer lines owned and operated by the City of Baltimore, approximately 16 miles is 6-inch diameter, which is not included in the 2002 Consent Decree. While these pipes represent a small portion of the collection system, they generate a disproportionate number of service disruptions because they were constructed in the early 1900s using vitrified clay pipe and substandard construction methods by today's requirements. Faced with the question of how to deal with these problematic small sewer lines, Baltimore City decided to perform a comprehensive condition assessment, followed by the renewal of the assets depending on the results of the assessments. The 16 miles of 6-inch sewers was prioritized for condition assessment based on history of complaints and pending street rehabilitation projects. The intent of this project is to improve the level of service these assets can provide, thereby minimizing service disruptions and potential public health impacts associated with SSOs and basement back-ups.
机译:在巴尔的摩市拥有和运营的1,300英里的卫生下水道,大约16英里的直径为6英寸,这不包括在2002年同意法令中。虽然这些管道代表了集合系统的一小部分,但它们会产生不成比例的服务中断,因为它们在20世纪初建造了今天的玻璃化粘土管和利益施工方法,通过今天的要求。面对如何处理这些有问题的小型下水道的问题,巴尔的摩市决定进行全面的条件评估,然后根据评估的结果续签资产。根据投诉历史和待街康复项目的历史,为条件评估提供了16英里的6英寸下水道。该项目的目的是提高这些资产可以提供的服务水平,从而最大限度地减少与SSO和地下室备份相关的服务中断和潜在的公共卫生影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号