首页> 外文会议>Pipelines conference >Keys to Successful Delivery of a Design-Build Pipeline
【24h】

Keys to Successful Delivery of a Design-Build Pipeline

机译:成功交付设计构建管道的钥匙

获取原文
获取外文期刊封面目录资料

摘要

Design-build delivery opportunities for pipeline projects are increasing dramatically in the water and wastewater sector. As an informative example of successful delivery of a design-build pipeline, we will discuss the city of Modesto (City) North Valley Regional Recycled Water Program (NVRRWP) Pipeline in Modesto, California. The pipeline will convey highly-treated wastewater from the City's tertiary treatment plant and serve as an important regional solution to address water supply shortages faced by agricultural customers. This case study will explore various keys to successful delivery of the 7 mi (11.2 km), 42-in (1.06 m) diameter recycled water pipeline that included a 2,800 ft (853 m) long horizontal directionally drilled (HDD) trenchless crossing of the San Joaquin River in an environmentally sensitive area with seismically sensitive soils, including: 1) development of a successful design-build proposal: we will share strategies on how to structure an effective design-build team and prepare a winning proposal; 2) delivery strategies to fast-track schedule including early procurement and contract packages; 3) addressing open cut and trenchless design and construction issues that included balancing pipe/embedment design optimization in poor soils areas, geotechnical/seismic challenges through the San Joaquin floodplain, and schedule delays due to high San Joaquin River levels; 4) satisfying challenging environmental and regulatory agency permit conditions for the HDD crossing of the San Joaquin River using a collaborative approach between owner, contractor, designer, and agencies.
机译:水资源和废水部门的设计制造送货机会正在急剧增加。作为成功交付设计建设管道的信息,我们将讨论莫德斯托(市)北谷区域再生水计划(NVRRWP)管道,加利福尼亚州莫德斯托。管道将从城市的三级处理厂传达高度处理的废水,并作为一个重要的区域解决方案,以解决农产品客户面临的供水短缺。本案例研究将探讨成功递送7英里(11.2公里),42英寸(1.06米)直径再生水管道的各种钥匙,其中包括2,800英尺(853米)长的水平方向钻孔(HDD)的挖沟横向三何奎因河在一个环保区的地震敏感的土壤中,包括:1)开发成功的设计 - 建立建议:我们将分享关于如何构建有效设计制造团队的战略,并准备一个获胜提案; 2)快速轨道时间表的交付策略,包括早期采购和合同包裹; 3)解决开放式切割和开挖设计和施工问题,包括平衡管道/嵌入式设计优化,在贫困的土壤区域,通过San Joaquin洪泛区的岩土/地震挑战,以及由于圣胡同河水平的延误计划; 4)满足具有挑战性的环境和监管机构许可在所有者,承包商,设计师和机构之间的协作方法使用合作方法的HDD交叉。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号