首页> 外文OA文献 >Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72' Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal
【2h】

Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72' Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal

机译:基本建设项目的经济和保护评估:爱丁堡灌溉区伊达尔戈县1-72“管道替换输水管道和多尺寸管道替换输水管道

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by Edinburg Irrigation District Hidalgo County No. 1 to the North American Development Bank (NADBank). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., 72" pipeline replacing a segment of delivery canal along the "Curry Main" and multi-size pipeline replacing a segment of delivery canal along the "North Branch / East Main"). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters.Expected cost of water savings and cost of energy savings for both components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $29.87 per ac-ft and energy savings are measured at an aggregate value of $0.0000595 per BTU (i.e., $0.203 per kwh).In addition, expected values are indicated for the Bureau of Reclamation's three principal evaluation measures specified in the United States Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $50.90 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0000777 per BTU ($0.265 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -2.01.
机译:针对爱丁堡灌溉区伊达尔戈县1号向北美开发银行(NADBank)提出的基本建设项目,确定了初始建设成本以及运营和维护支出的年度净变化。在拟议项目的两个组成部分的整个预期使用寿命内,都确定了节水和节能的名义成本和实际成本,预期经济和财务成本(例如,用72条管道代替沿“ Curry Main”管道和多条运输管道的一部分)尺寸的管道替换了沿“北支线/东干线”的一段输水管道),给出了节水成本和能源节约成本对几个重要参数的敏感性结果。预计节水成本和能源节约成本这两个组成部分的总和将被合并为整个拟议项目的一套成本计量方法,节水的总成本估计为每平方英尺29.87美元,而节能量的总价值为每BTU 0.0000595美元(即,每BTU为0.203美元)。此外,还会根据美国第106-576号公法中的规定,为垦殖局的三项主要评估措施指明期望值。每ac-ft节水措施的总初始建筑成本为每ac-ft节水50.90美元。每BTU(kwh)的节能措施的初始建设总成本为$ 0.0000777 / BTU($ 0.265 / kwh)。每美元初始建设成本与每年总经济节省的比率估计为-2.01。