The size and configuration of an existing rock toe was a key piece of information required for evaluating possible dam safety modifications for Rampart Dam, Colorado. Geophysical investigations consisting of six Electric Resistivity Imaging (ERI) survey lines were successfully used to define the extent of the rock toe. Seven drill holes were completed to confirm the results of the ERI survey. The geophysical investigations reduced the total cost of the field investigations and limited the extent of intrusive investigations. Rampart Dam, an approximately 250-ft high zoned embankment dam, is classified as a high hazard structure. The facility is owned, operated, and maintained by Colorado Springs Utilities (Utilities). Rampart Dam provides terminal water supply storage for the Utilities' system and is a critical component of the water supply system. The rock toe is located at the downstream toe of the dam. Seepage has exited the downstream face of the embankment above the rock toe since original construction of the dam. Concerns regarding the observed seepage at this location are: 1) unfiltered seepage exiting the downstream slope above the rock toe, and 2) apparent lack of filters between the embankment shell (Zone 2) material and the rock toe. Seepage gradients within the dam appear to be low, seepage conditions have been consistent for a long period of time, and no evidence of internal erosion has been reported. However, seepage is exiting the dam at unfiltered locations, so the possibility of development of internal erosion cannot be ruled out. Utilities desired to evaluate alternatives to address the seepage concerns. The rock toe was built as part of the original construction completed in 1969, and the size and configuration of the rock toe was not clear, based on information from design and construction and previous subsurface investigations. It became clear that the size and configuration of the rock toe could limit the extent of the downstream section of the dam that could be practically excavated, which in turn affected the feasibility of some modification alternatives. Field investigations to define the extent and configuration of the rock toe became a priority.
机译:现有岩石脚趾的大小和构造是评估科罗拉多州Rampart大坝可能进行的大坝安全性修改所需的关键信息。由六条电阻率成像(ERI)测量线组成的地球物理调查已成功用于定义岩趾的范围。完成了七个钻孔,以确认ERI调查的结果。地球物理调查降低了现场调查的总成本,并限制了侵入式调查的范围。大约250英尺高的分区堤坝Rampart大坝被列为高危结构。该设施由科罗拉多斯普林斯公用事业公司(Utilities)拥有,运营和维护。 Rampart大坝为公用事业系统提供终端供水,是供水系统的重要组成部分。岩石脚趾位于大坝的下游脚趾。自从大坝的原始建设以来,渗流已经离开了脚趾上方的路堤的下游面。与在该位置处观察到的渗漏有关的问题是:1)未过滤的渗漏从岩脚趾上方的下游坡面流出,以及2)在路堤外壳(第2区)材料和岩趾之间明显缺少过滤器。大坝内的渗流梯度似乎很低,渗流条件已经很长时间了,并且没有内部侵蚀的证据。但是,渗流从未经过滤的位置流出大坝,因此不能排除内部侵蚀发生的可能性。希望评估替代方案以解决渗漏问题的公用事业公司。岩石脚趾是1969年完成的原始建筑的一部分,根据设计和施工以及先前的地下勘测的信息,岩石脚趾的大小和构造尚不清楚。显然,岩趾的尺寸和构造可能会限制实际可开挖的大坝下游部分的范围,进而影响某些改型方案的可行性。确定岩石脚趾的范围和构造的野外调查成为当务之急。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号