Sarulla 330 MW Geothermal Project Key Success Factors in Development

机译:Sarulla 330 MW地热项目开发的关键成功因素

获取原文

摘要

Located in the Tapanuli Utara District, North Sumatra province in Indonesia, the 330 MW Sarulla power plant is set to be the world's largest geothermal power plant when its construction is completed in 2019. At this time construction has started but the story of the development of this power plant is a long and interesting one on many levels; it demonstrates the challenges and risks that geothermal developers will face on the road to success, from regulatory through economics, technical, legal and financing aspects. Many people and organizations have worked tirelessly for years to bring the plant to fruition and in this paper we shall outline the history and the various challenges the project has faced, highlighting the major criteria for overcoming such challenges, while ensuring successful development. The project originally started development by Unocal in 1993, and in 2004 was retendered by PLN (the Indonesian national electricity company). PLN took over Unocal's interest in the JOC (Joint Operation Contract) and the PPA (Power Purchase Agreement). In 2006, the Medco-Ormat-Itochu Consortium won the tender to develop the project. Today the Consortium consists of Medco Energi Internasional Tbk, Ormat Technologies, Inc.; Itochu Corporation and Kyushu Electric Power Co. Inc. Based on the above considerations, SOL (as contractor to PT Pertamina Geothermal Energy, "PGE") formally gave notice of its intention to develop a geothermal power plant of approximately 330 MW capacity in the Sarulla Contract Area. This will be comprised of the following units (or stages) as set out in Appendix Ⅳ of the JOC. 1. First Unit and Second Unit - the SIL Plant: approximately 83-110 MW in 2016 (possibly in several increments) 2. Third Unit and Fourth Unit - the NIL Ⅰ Plant: approximately 76-110 MW in 2017 (possibly in several increments) 3. Fifth Unit and Sixth Unit-the NIL Ⅱ Plant: approximately 76-110 MW in 2018 (possibly in several increments).
机译:330兆瓦的萨鲁拉电厂位于印度尼西亚北苏门答腊省塔帕努利乌塔拉区,预计2019年完工,将成为世界上最大的地热电厂。这个发电厂在许多层面上都是漫长而有趣的发电厂;它展示了地热开发商在从监管到经济,技术,法律和融资方面的成功之路上将面临的挑战和风险。许多年来,许多人和组织不懈地工作,使该工厂得以实现。在本文中,我们将概述该项目的历史和面临的各种挑战,着重指出克服这些挑战的主要标准,同时确保成功的发展。该项目最初由Unocal于1993年开始开发,并于2004年由PLN(印度尼西亚国家电力公司)重新招标。 PLN接管了Unocal在JOC(联合运营合同)和PPA(电力购买协议)中的权益。 2006年,Medco-Ormat-Itochu联盟赢得了开发该项目的招标。今天,该联盟由Ormat Technologies,Inc.的Medco Energi Internasional Tbk组成;基于上述考虑,伊藤忠商事株式会社和九州电力公司(作为PT Pertamina地热能的承包商,“ PGE”)正式宣布其打算在Sarulla开发约330 MW容量的地热发电厂的意图。合同区。这将由JOC附录Ⅳ中列出的以下单元(或阶段)组成。 1.第一单元和第二单元-SIL工厂:2016年约83-110兆瓦(可能有几个增量)2.第三单元和第四单元-NILⅠ工厂:2017年约76-110 MW(可能有几个增量) )3. NILⅡ电厂的第五机组和第六机组:2018年约76-110兆瓦(可能有几个增量)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号