首页> 外文会议>Low impact development conference >Not in my front yard: overcoming public resistance to urban GSI retrofit projects
【24h】

Not in my front yard: overcoming public resistance to urban GSI retrofit projects

机译:不在我的前院:克服公众对城市GSI改造项目的抵抗力

获取原文

摘要

Retrofitting dense urban neighborhoods with green stormwater infrastructure (GSI) requires early and ongoing outreach to the affected public. Add in a combined sewer overflow (CSO) control project that is under a federal consent decree, giving affected neighbors little choice about the upcoming changes to their neighborhood, and a troubled history with large-scale GSI projects in the city, and public outreach takes on greater importance. The King County Wastewater Treatment Division took on its first GSI project for CSO control in two Seattle neighborhoods. Community outreach on the project design began in earnest in 2011. The project, which is nearing the completion of its first construction season, has overcome many challenges and has learned lessons about how to effectively work with the affected community on large-scale urban GSI projects. This paper focuses on the outreach tools and techniques employed during the design phase that built community acceptance of the project and enabled a smooth transition into construction and operation. Examples include taking advantage of creative educational opportunities, building relationships and trust, understanding and speaking to specific concerns about retrofit GSI projects, employing effective outreach techniques (going beyond public meetings), and building neighborhood trust in the construction team. These lessons are applicable to any agency or developer who wants to implement GSI in a dense, heavily used public space where public concerns could slow or stop your project.
机译:与绿色雨水基础设施(GSI)改造密集的城市社区需要提前和持续的外展给受影响的公众。在联合会同意法令下加入组合的下水道溢出(CSO)控制项目,使受影响的邻居对其社区的即将发生变化的选择,以及该市大规模GSI项目的陷入困境的历史,以及公开的外展更重要。国王县污水处理部门在两个西雅图街区的CSO控制中采用了第一个GSI项目。关于项目设计的社区外展在2011年开始始于最终。该项目接近其第一个施工赛季的完成,克服了许多挑战,并已经了解如何在大型城市GSI项目上有效地与受影响的社区有效合作的经验教训。本文重点介绍在设计阶段期间采用的外展工具和技术,建立了该项目的社区接受,并使其能够平稳过渡到建设和运营中。例子包括利用创造性的教育机会,建立关系和信任,理解和对特定担忧,与GSI项目的特定担忧,采用有效的外展技术(超越公开会议),并在建筑队伍中建立邻里信任。这些课程适用于任何想要在密集,大量使用的公共空间中实施GSI的机构或开发人员,其中公共关注可能会缓慢或阻止您的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号