首页> 外文会议>IEEE Innovative Smart Grid Technologies - Asia >Economic power flow adjustment technique using series capacitor and generator output adjustment for generation configuration change
【24h】

Economic power flow adjustment technique using series capacitor and generator output adjustment for generation configuration change

机译:使用串联电容器和发电机输出调节来改变发电配置的经济潮流调节技术

获取原文

摘要

As a response to economic growth, electric power utilities installed many electric power facilities to meet power demand. However, these facilities have aged and should be replaced in the near future. Moreover, after the Great East Japan Earthquake, significant power flow changes in power system would likely to happen. Therefore, for electric power facilities planning, it is necessary to solve such power flow problems. In this paper, we assume a protracted loss of generation capabilities in a nuclear power plant and examine the resulting load changes. We propose the use of series capacitors on non-heavily loaded lines to alleviate load differences among transmission lines. We also propose the concept of mitigation flow sensitivity (MFS). By installing series capacitors at effective locations and determining compensation amounts by prioritizing the MFS, we can solve the power flow problems. We carry out simulations to confirm the validity of the proposed method.
机译:为了响应经济增长,电力公司安装了许多电力设施来满足电力需求。但是,这些设施已经老化,应在不久的将来进行更换。而且,在东日本大地震之后,电力系统中的潮流可能会发生重大变化。因此,对于电力设施规划,有必要解决这样的潮流问题。在本文中,我们假设核电厂的发电能力会长期损失,并检查由此产生的负荷变化。我们建议在非重载线路上使用串联电容器,以减轻传输线路之间的负载差异。我们还提出了缓解流量敏感度(MFS)的概念。通过在有效位置安装串联电容器并通过优先考虑MFS来确定补偿量,我们可以解决潮流问题。我们进行了仿真,以验证所提出方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号