首页> 外文会议>IEEE International Conference on Industrial Engineering and Engineering Management >Productivity improvement in logistical work systems of the genuine parts supply chain
【24h】

Productivity improvement in logistical work systems of the genuine parts supply chain

机译:真正的零件供应链的物流工作系统的生产率提高

获取原文

摘要

Within the entire value stream of spare part supply, packing is one of the main issues in the distribution system and its productivity is mainly affected by a particularly high proportion of manual work. Considering the total value stream of supplying original spare parts, picking and packaging are two of the most important activities in the distribution system and they are mainly performed by intensive manual tasks. As practice shows, the methods Value Stream Design and Methods-Time Measurement (MTM) have proven to be suitable for improvement work and consequently for increasing productivity especially in work systems with manual work. This paper shows how the process building block system “MTM logistics data” contributes to planning and specifying parameters of target-conditions of value streams. It also presents a methodical approach to support practical improvement work in logistical value streams and within their work systems.
机译:在备件供应的整个价值流中,包装是分配系统中的主要问题之一,其生产率主要受手工作业比例特别高的影响。考虑到供应原始备件的总价值流,拣配和包装是分销系统中最重要的两项活动,它们主要由密集的手动任务执行。如实践所示,“价值流设计”和“方法-时间测量”(MTM)方法已被证明适用于改进工作,因此适用于提高生产率,特别是在具有人工工作的工作系统中。本文展示了流程构建块系统“ MTM物流数据”如何有助于计划和指定价值流目标条件的参数。它还提出了一种有条理的方法来支持物流价值流及其工作系统中的实际改进工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号