首页> 外文会议>IEEE International Conference on Industrial Engineering and Engineering Management >Factor affecting construction labor productivity in Thailand
【24h】

Factor affecting construction labor productivity in Thailand

机译:影响泰国建筑劳动生产率的因素

获取原文

摘要

The construction industry is one of the most significant economics drivers of a country. However, there are many construction projects have a low labor productivity problem which leads project delaying and cost of the project overrunning. The objective of this study is to determine the factors effecting construction productivity in construction project in Thailand. A structured questionnaire survey was conducted and completed by 55 Thai construction contractors who involve in construction project in Thailand. The five highest ranking factors effecting labor productivity were absenteeism of worker; labor skill and experience; financial shortage; inspection and instruction delay; incomplete drawings. This study finding can be applied for labor productivity improvement in construction project. The project manager should focus on these factors at the early stage of construction project to gain effective results in productivity.
机译:建筑业是一个国家最重要的经济推动力之一。但是,有许多建设项目劳动生产率低的问题,这导致项目延误和项目超支成本。本研究的目的是确定影响泰国建筑项目中建筑生产率的因素。由涉及泰国建筑项目的55名泰国建筑承包商进行了结构化的问卷调查。影响劳动生产率的五个最高因素是工人的缺勤。劳动技能和经验;财政短缺;检查和指示延迟;图纸不完整。该研究结果可用于建设项目劳动生产率的提高。项目经理应在建设项目的早期阶段关注这些因素,以获得有效的生产率结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号