首页> 外文会议>IEEE Power and Energy Conference at Illinois >Evaluation of hub concept for wind turbines
【24h】

Evaluation of hub concept for wind turbines

机译:风力涡轮机枢纽概念评价

获取原文
获取外文期刊封面目录资料

摘要

This paper simulates the transient response of three wind farms interconnected, rated 9MW each. Each wind farm consists of six Doubly Fed Induction Generator (DFIG) turbines rated at 1.5MW each, interfaced with power electronics on the rotor side. The three wind farms connected to the grid are built and modelled in MATLAB-Simulink. With the rapid development in Generation Interconnect Requests and development of the Hub concept, it is necessary to model the interconnection of wind farms to study the transient characteristics. The three wind farms are interconnected at a single point on the transmission line to increase efficiency and reliability. Analysis on voltage stability of wind farms due to faults on the neighbouring wind farm was done. A STATCOM was installed at the terminals of each wind farm to provide additional voltage stability and reactive power capabilities.
机译:本文模拟了三个风电场互联的瞬态响应,每次额定额定为9MW。 每个风电场由六个双馈电流发电机(DFIG)涡轮机组成,每个涡轮机均以1.5MW额定电流在转子侧的电力电子器件接口。 连接到网格的三个风电场在Matlab-Simulink中构建和建模。 随着代表互连请求的快速发展以及集线器概念的发展,有必要建模风电场的互连,以研究瞬态特征。 三个风电场在传输线上的单点相互连接,以提高效率和可靠性。 完成了邻近风电场故障导致风电场电压稳定性的分析。 STATCOM安装在每个风电场的终端,以提供额外的电压稳定性和无功功率功能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号