PLANNING, DESIGN, AND EXECUTION OF AN AUTOMATION SYSTEM REPLACEMENT DURING A SCHEDULED OUTAGE

机译:计划内停机期间进行自动化系统更换的计划,设计和执行

获取原文

摘要

Many mills are contending with aging and multigenerational control systems that are failing or obsolete. Most mills only have their scheduled annual/biennial/triennial outages to tackle the necessary improvements to these systems. The amount of work needed, the critical importance of the systems involved, and the looming risk of an extended outage - along with the potential for lost revenue - all add to the daunting task. This paper will discuss a specific project executed to update the instrumentation, DCS controls, burner management system, and associated electrical infrastructure for a recovery boiler at Georgia-Pacific's Camas WA mill, with all construction and commissioning successfully completed during a scheduled two-week outage. This paper will describe techniques, practices, and activities used throughout the planning, design, and execution of the project, will share pit-falls and lessons learned, and will highlight the importance of teamwork between the Owner, the Engineer, and the Contractor.
机译:许多工厂都在努力应对老化或过时的失效或过时的多代控制系统。大多数工厂仅按计划每年/每两年/每三年一次停机,以解决对这些系统的必要改进。所需的工作量,所涉及系统的关键重要性以及持续中断的迫在眉睫的风险以及潜在的收入损失,所有这些都增加了艰巨的任务。本文将讨论为更新乔治亚州太平洋Camas WA工厂的回收锅炉的仪表,DCS控制,燃烧器管理系统以及相关的电气基础设施而执行的特定项目,在计划的两周停运期间将成功完成所有建设和调试工作。 。本文将描述在项目的整个计划,设计和执行过程中使用的技术,实践和活动,将分享陷阱和经验教训,并强调所有者,工程师和承包商之间团队合作的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号