Development of A Risk-Informed Approach To The Seismic Evaluation of Hydropower Projects - Methodology

机译:水电项目地震评估的风险告知方法的开发-方法论

获取原文

摘要

Approximately ten years ago Bakun, et al. presented new information about the magnitude and location of the 1872 Chelan earthquake. This work prompted the Federal Energy Regulatory Commission (FERC) to re-evaluate the earthquake ground motions that could be expected at hydropower projects in the Mid-Columbia region. At the same time, the FERC was laying the groundwork to move toward adopting a risk-informed regulatory approach to dam safety. For these reasons, they recommended the Mid-Columbia public utility districts (PUD), Chelan, Grant and Douglas counties, work together to conduct a probabilistic seismic hazard analysis (PSHA) for the region. Now that the FERC has formally committed to incorporating risk-informed decision making into its dam safety program, this paper addresses two fundamental questions: 1. How can the results of a PSHA be used in the seismic safety evaluation of hydropower projects? and 2. How can risk-informed seismic evaluations of hydropower projects be carried out in the context of the FERC's commitment to incorporate risk-informed decision-making in its regulatory processes? Working with the FERC, Chelan and Grant County PUD's initiated a project to develop a risk-informed seismic evaluation process to address these questions. As part of this effort they are currently evaluating several project sub-systems with the ultimate intent of implementing the methodology for their entire projects. This paper summarizes the risk-informed seismic project and some of the lessons and insights that have been learned.
机译:大约十年前,Bakun等人。介绍了有关1872年Chelan地震的震级和位置的新信息。这项工作促使联邦能源管理委员会(FERC)重新评估了哥伦比亚中部地区水电项目可能发生的地震地面运动。同时,FERC正在为向大坝安全采用风险相关的监管方法奠定基础。由于这些原因,他们建议哥伦比亚中部公共事业区(Cheap,Grant and Douglas Countys)共同开展对该地区的概率地震灾害分析(PSHA)。既然FERC正式致力于将基于风险的决策纳入其大坝安全计划,那么本文将解决两个基本问题:1.如何将PSHA的结果用于水电项目的地震安全评估?和2.在FERC承诺将风险知情的决策纳入其监管流程的背景下,如何对水电项目进行风险知情的地震评估?凯兰(Chelan)和格兰特县(Grant County)PUD与FERC合作,启动了一个项目,以开发风险相关的地震评估程序来解决这些问题。作为这项工作的一部分,他们目前正在评估几个项目子系统,其最终目的是为整个项目实施该方法。本文总结了有关风险的地震项目以及已学到的一些经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号