L-8 FLOW EQUALIZATION BASIN PROJECT - CONVERTING RETIRED ROCK QUARRIES FOR ENVIRONMENTAL RESTORATION

机译:L-8流动均衡化盆地项目-转换后的恢复环境的岩石质量

获取原文

摘要

The South Florida Water Management District (SFWMD) is responsible for implementing projects to improve water quality and water flow into the Everglades. The L-8 Flow Equalization Basin (FEB) Project involves improvements to an existing, retired rock quarry in Western Palm Beach County. The FEB will improve water quality in the Everglades by capturing stormwater flows, storing and attenuating the water to the local stormwater treatment areas (STAs) for phosphorus removal prior to delivery to the Arthur R. Marshall Loxahatchee National Wildlife Refuge. The accelerated Design/Build project is being executed by Archer-Western Contractors, Inc. and Jacobs Engineering Group, Inc. (Jacobs). Project features include: 1. Approximately 46,000 acre-feet (15 billion gallons) of storage with perimeter embankment improvements, cell modifications and a new boat ramp facility. 2. An extension of the inflow-outflow canal connecting the FEB to the existing L-8 Canal, as well as the installation of a new access road bridge across the canal. 3. G-538 Spillway - A new gated control structure, with a maximum flow capacity of 3,000 cfs, connecting the FEB to the existing L-8 Canal, including a concrete outfall channel that extends to the bottom of the L-8 FEB with a USBR Type Ⅲ stilling basin. 4. G-539 Pump Station - A new 2-stage pumping facility, with a maximum pumping capacity of 450 cfs, connecting the L-8 FEB to the existing L-8 Canal. 5. A sustainable project designed to capture stormwater flows and store them for use for dry season hydration of the STAs. The project converts a 1,000 acre retired rock mine to a below-ground FEB/storage reservoir. No new lands are impacted by the construction of the L-8 FEB. The unique geology at this particular site consists of dense rock and sand minimizing the loss through seepage outflows. This paper will provide an overview of the project and present some of the design and construction features and challenges for the L-8 Flow Equalization Basin Project in the South Florida environment.
机译:南佛罗里达州水管理区(SFWMD)负责实施改善水质和流入大沼泽地的水的项目。 L-8流量均流盆地(FEB)项目涉及对西棕榈滩县现有的一个退休的采石场进行的改进。 FEB将通过捕获雨水流量,将水存储和减毒到当地雨水处理区(STA)以便在将其运往Arthur R. Marshall Loxahatchee国家野生动物保护区之前进行除磷,来改善大沼泽地的水质。加速的设计/建造项目由Archer-Western Contractors,Inc.和Jacobs Engineering Group,Inc.(Jacobs)执行。该项目的特点包括:1.约46,000英亩英尺(150亿加仑)的存储量,周边路堤得到改善,小区改造和新的船舷梯设施。 2.扩建流入和流出的运河,将FEB连接到现有的L-8运河,并安装一条横跨该运河的新通道桥。 3. G-538溢洪道-一种新的闸门控制结构,最大流量为3,000 cfs,将FEB连接到现有的L-8运河,包括一条混凝土排污通道,延伸到L-8 FEB的底部, USBRⅢ型消音盆。 4. G-539泵站-新的两级泵送设施,最大泵送能力为450 cfs,将L-8 FEB连接到现有L-8运河。 5.一个可持续的项目,旨在捕获雨水流量并将其存储以供STA进行旱季水合作用。该项目将一个1,000英亩的退役矿山转换为地下FEB /存储库。 L-8 FEB的建设不会影响任何新土地。该特定地点的独特地质学包括致密的岩石和沙子,可将由于渗漏流出而造成的损失降至最低。本文将对该项目进行概述,并介绍南佛罗里达环境中的L-8流量均衡盆地项目的一些设计和施工特点以及面临的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号