首页> 外文会议>IEEE International Conference on Industrial Engineering and Engineering Management >Joint optimization of production-maintenance plans based on optimal production rates
【24h】

Joint optimization of production-maintenance plans based on optimal production rates

机译:根据最优生产率联合优化生产维护计划

获取原文

摘要

This paper deals with production and maintenance plans. Among a set of proposed requests, the production system must satisfy several of them. Each request is characterized by a profit, products quantity and delivery date. The choice of the requests to perform must allow to maximize net profit. To achieve this objective, preventive maintenance plans and optimal production rates associated with each request must be computed jointly. To solve this problem, a great deluge algorithm is used. A numerical example is also given to illustrate the proposed model.
机译:本文涉及生产和维护计划。在一组提出的要求中,生产系统必须满足其中几个要求。每个请求都以利润,产品数量和交货日期为特征。选择要执行的请求必须允许最大化净利润。为了实现此目标,必须共同计算与每个请求相关的预防性维护计划和最佳生产率。为了解决这个问题,使用了一种很棒的洪水算法。数值例子也说明了所提出的模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号