A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects

机译:利益相关者之间关于马来西亚多个设计和建造项目中时间延迟原因的比较研究

获取原文

摘要

The construction industry plays an important role in developing a nation to a fully developed status. The construction industry, unlike other industries has unique problems concerning project completion. Projects are now more complicated involving huge contract values, participants from multi-discipline, more specialised works, tighter schedule, more cost consciousness, stringent quality standards, etc. Ultimately, cost and time are the two key parameters that play significant role in construction project management. In Malaysia very few studies have been attempted on the factors causing time delay. Besides, there has been no such study related to multiple Design and Build (D&B) projects. The study focused on D&B projects which have complicated risk governed with fixed time and a fixed contract sum (Lump sum). Thus there is a need for comparative study on the risk factors causing this time delay which enables the Malaysian construction to respond proactively and more effectively to time delay factors.
机译:建筑业在发展国家到全面发展的过程中起着重要作用。与其他行业不同,建筑行业在项目完成方面存在独特的问题。现在,项目变得更加复杂,涉及巨大的合同价值,多学科的参与者,更专业的作品,更紧迫的时间表,更多的成本意识,严格的质量标准等。最终,成本和时间是在建设项目中发挥重要作用的两个关键参数管理。在马来西亚,很少有人尝试研究造成时间延迟的因素。此外,还没有与多个设计和建造(D&B)项目相关的研究。该研究的重点是D&B项目,这些项目具有固定的时间和固定的合同金额(总价)控制复杂的风险。因此,需要对造成这种时间延迟的风险因素进行比较研究,以使马来西亚建筑能够对时间延迟因素做出积极而有效的反应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号