首页> 外文会议>International Conference on Control, Decision and Information Technologies >Optimization of integrated employee timetabling and Hybrid Job Shop Scheduling under time lag constraints
【24h】

Optimization of integrated employee timetabling and Hybrid Job Shop Scheduling under time lag constraints

机译:时滞约束下集成员工时间表和混合作业车间调度的优化

获取原文

摘要

This paper studies two important problems, often encountered in the manufacturing industry and particularly in the tanneries: human resources planning and production scheduling. In this work, we focus on the problem that integrates Employee Timetabling [ETP] by considering their skills under various constraints, with a Hybrid Job-Shop Scheduling [HJS] under time lag constraints. After presenting and formulating our problem as a Mixed Linear Program, we propose a resolution method based on decomposition and cut generation by combining Mixed Linear Programming and Constraint Programming. Using numerical experimentations, we show the advantage of decomposition and cut generation, in terms of resolution time.
机译:本文研究了制造业中,尤其是制革厂中经常遇到的两个重要问题:人力资源计划和生产计划。在这项工作中,我们关注的问题是通过考虑员工在各种约束条件下的技能,将员工时间表(ETP)与时滞约束条件下的混合作业车间调度(HJS)集成在一起的问题。在提出并表述为混合线性程序的问题后,我们提出了一种基于分解和分割生成的解析方法,将混合线性程序和约束程序相结合。通过数值实验,我们在分解时间上展示了分解和切割生成的优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号