首页> 外文会议>IEEE Aerospace Conference >Plutonium-238 supply project ??? Additional processing enabling power for future NASA missions
【24h】

Plutonium-238 supply project ??? Additional processing enabling power for future NASA missions

机译:Plutonium-238供应项目???额外的处理能够为未来的美国航空航天局任务提供电力

获取原文

摘要

For more than five decades, Radioisotope Power Systems (RPSs) have enabled space missions to operate in locations where the Sun's intensity is either too dim, obscured, or otherwise inadequate for solar power or other conventional power-generation technologies. The natural decay of the radioisotope plutonium-238 (238Pu) provides the heat source used by an RPS to generate electricity (as well as heat to keep key subsystems warm) for National Aeronautics and Space Administration (NASA) missions such as Voyagers 1 and 2, the Cassini mission to Saturn, the New Horizons flyby of Pluto, and the Mars Curiosity rover. The United States has not produced new 238Pu since the late 1980s. RPS-powered missions have continued since then using existing 238Pu inventory managed by the U.S. Department of Energy (DOE), including material purchased from Russia. NASA and DOE have determined that a new domestic supply is needed to ensure the continued availability of RPSs for future NASA missions. Using funding provided by NASA since 2011, DOE is currently executing a project to reestablish a 238Pu supply capability using its existing facilities and reactors. The project, known as the Plutonium-238 Supply Project (PSP) is led by the DOE Oak Ridge National Laboratory (ORNL). This paper will provide an overview of the PSP approach, its progress to date, and the potential benefits to NASA of missions that could be enabled by the new production of 238Pu.
机译:超过五十年,放射性同位素电力系统(RPSS)使空间任务能够在太阳强度的位置运行太暗淡,模糊或以其他方式对于太阳能电源或其他传统发电技术而言。放射性同位素钚-238(238PU)的自然衰减提供了RPS用于产生电力(以及为全国航空航空航天局(NASA)特派团(如Voyagers 1和2)的电力(以及保持关键子系统温暖的热量)的热源迦里尼的土星,冥王星的新视野和火星好奇罗孚的特派团。自20世纪80年代后期以来,美国并未产生新的238倍。从那时起,RPS动力任务继续使用美国能源部(DOE)管理的现有238普库存,包括从俄罗斯购买的材料。美国宇航局和母鹿已经确定需要新的国内供应,以确保持续可用的RPS用于未来的NASA任务。自2011年以来,使用NASA提供的资金,DOE目前正在执行项目以使用现有的设施和反应堆重新建立238倍的供应能力。该项目称为钚-238供应项目(PSP)由Doe Oak Ridge National实验室(ORNL)领导。本文将概述PSP方法,其迄今为止的进展情况,以及可通过新增238普的新航空航空航天局的潜在利益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号