首页> 外文会议>International conference on construction and real estate management >Dynamic Research on Stakeholders of the Utility Tunnel PPP Project
【24h】

Dynamic Research on Stakeholders of the Utility Tunnel PPP Project

机译:实用隧道PPP项目利益相关者的动态研究

获取原文

摘要

The stakeholders of the utility tunnel PPP project are more numerous, and the relationship between them is more complicated compared with the project adopting the traditional model. The stable relationship and the unanimous goals between the stakeholders can lead to the success of the project. So, in order to make the project a success and exert the advantages of the PPP model, it is necessary to do the dynamic study of the stakeholders of the project. This paper takes the whole life cycle as the angle of view to divide the operation process of the utility tunnel PPP project into stages; defines the main stakeholders of the project based on the literature research method and the generalized stakeholder theory, combined with the analysis of typical cases, and analyzes their roles and effects based on literature research and generalized stakeholder theory. In the end, the path of entry and exit is analyzed by using graphics to describe the participation of each stakeholder. And I hope to lay the foundation for the follow-up study of the relationship among the stakeholders and the improvement of the synergy effect of the organization.
机译:公用事业隧道PPP项目的利益攸关方更加多,与采用传统模型的项目相比,它们之间的关系更加复杂。利益相关者之间的稳定关系和一致的目标可以导致项目的成功。因此,为了使项目成功并发挥PPP模型的优势,有必要对项目的利益相关者进行动态研究。本文将整个生命周期作为视角,以将公用事业隧道PPP项目的操作过程划分为阶段;基于文献研究方法和广义利益相关者理论来定义项目的主要利益相关者,结合典型案例的分析,分析了基于文学研究与广义利益相关者理论的作用与效应。最后,通过使用图形来描述进入和退出的路径来描述每个利益相关者的参与。我希望为利益攸关方之间关系的后续研究以及组织协同效应的后续研究奠定基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号