AREMA UNLOADING PIT CALCULATIONS

机译:阿雷玛卸载坑计算

获取原文

摘要

The paper submitted for publication will document the process taken to revise the unloading pit section of the AREMA manual. The original section on unloading pits was incorporated into the Manual in 1993. Upon review of Section 8.4 for reaffirmation in 2010, it was determined that the figures in section were developed prior to the implementation of the alternate loading and the concrete figures should be removed from Chapter 15. Figures 15-8-5 and 15-8-6 were reviewed in relation to current live load and fatigue criteria specified in Section 1. The documentation will include commentary of the history of the section, steps take to revise the section, and the detailed calculations required to make the table changes.
机译:提交出版的论文将记录修订AREMA手册的卸货坑部分所采取的过程。卸货坑的原始章节已于1993年纳入《手册》。在对第8.4节进行审查以在2010年再次确认后,确定该节中的数字是在实施替代加载之前制定的,应从中删除具体数字。第15章针对第1节中指定的当前活荷载和疲劳标准对图15-8-5和15-8-6进行了审查。文档将包括对本节历史的注释,对本节进行修改所采取的步骤,以及更改表格所需的详细计算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号