首页> 外文会议>AREMA annual conference >Cost Savings through Innovation: Eagle P3 Project, Regional Transportation District, Denver, CO AREMA 2014 Annual Conference September 28-October 1, 2014
【24h】

Cost Savings through Innovation: Eagle P3 Project, Regional Transportation District, Denver, CO AREMA 2014 Annual Conference September 28-October 1, 2014

机译:通过创新节省成本:Early P3项目,区域运输区,丹佛,CO AREMA 2014年会2014年9月28日至10月1日

获取原文

摘要

The Eagle Project, conducted by the Denver Regional Transportation District (RTD) with the concessionaire team Denver Transit Partners (DTP), is a public-private-partnership (P3) to include the design, construction, financing, operation, and maintenance of track, vehicle, and associated infrastructure for commuter rail lines in Denver, CO. The $2.2 billion capital project, comprised of federal funds, RTD sales tax bonds, and private equity from the concessionaire team, will connect downtown Denver to Denver International Airport to the east, Wheat Ridge to the west, and Westminster to the north using 36-miles of new 25kV electrified commuter rail (effectively doubling RTD's existing system). It also includes 14 stations and a new commuter rail maintenance facility (CRMF). This paper will discuss the advantages gained by RTD through utilization of the P3 model. RTD has experienced both cost savings and schedule acceleration by encouraging and accepting the innovation brought to the Eagle Project by the DTP concessionaire team. Simultaneously, risk to RTD continues to be mitigated by the 28-year ownership and maintenance aspect of the project execution. Included herein is specific discussion of the innovation surrounding the live load impact factor used to design direct fixation bridges on the Eagle Project. The RTD-DTP concessionaire contract tasked the design team to investigate this design parameter. The design team's research, including the use of ACI-358.1R-92 and finite element modeling of the structures, showed that impact factors in the 10-15% range may be used. This differs significantly from the AREMA recommendation of 200%. Use of this lesser impact factor economized RTD direct fixation bridge design and construction and exemplifies the benefit of incorporating the expertise of a concessionaire.
机译:由丹佛地区运输区(RTD)与特许公司团队丹佛运输合作伙伴(DTP)进行的Eagle项目是一项公私合作伙伴关系(P3),其中包括轨道的设计,建造,融资,运营和维护,汽车和华盛顿州丹佛市通勤铁路的相关基础设施。这项耗资22亿美元的资本项目,包括联邦资金,RTD销售税债券和特许公司团队的私募股权,将使丹佛市中心与东部的丹佛国际机场相连,西部的Wheat Ridge和北部的Westminster,使用了36英里长的新25kV电气化通勤铁路(实际上使RTD的现有系统增加了一倍)。它还包括14个车站和一个新的通勤铁路维护设施(CRMF)。本文将讨论RTD通过使用P3模型获得的优势。通过鼓励和接受DTP特许公司团队为Eagle项目带来的创新,RTD既节省了成本,又加快了进度。同时,通过项目执行的28年所有权和维护方面,继续降低了对RTD的风险。此处包括围绕活荷载影响因素的创新的具体讨论,活荷载影响因素用于设计Eagle项目上的直接固定桥。 RTD-DTP特许合同要求设计团队研究此设计参数。设计团队的研究(包括使用ACI-358.1R-92和结构的有限元建模)表明,可以使用10%至15%范围内的影响因子。这与AREMA建议的200%显着不同。使用这种较小的影响因素可节省RTD直接固定桥的设计和施工,并体现了整合特许公司专业知识的好处。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号