首页> 外文会议>ASME power conference >STEAM GENERATOR REPLACEMENT PROJECT AT TVA'S SEQUOYAH UNIT 1 NUCLEAR POWER PLANT
【24h】

STEAM GENERATOR REPLACEMENT PROJECT AT TVA'S SEQUOYAH UNIT 1 NUCLEAR POWER PLANT

机译:TVA的Sequoyah单元1核电站蒸汽发生器更换项目

获取原文

摘要

Pressurized Water Reactor Power Plants have at times required that large components be replaced (steam generators weighing 750,000 Ibs) which have necessitated performing first time modifications to the plant that were unintended during the original design. The steam generator replacement project at Tennessee Valley Authority (TVA's) Sequoyah Nuclear Power Station necessitated (1) two large temporary openings (21'x45') in the plant's Shield Building roof (2' thick concrete) by hydro-blasting to allow the removal of the old generators and installation of the new, (2) removal and repair of the concrete steam generator enclosure roofs (20' diameter, 3' thick) which were removed by wire saw cutting and (3) the seismic qualification of; the design and construction of an extensive ring foundation for; the use of one of the world largest cranes to remove these components through the roof. This removal and replacement process had to be performed in an expeditious manner to minimize the amount of time the plant is shutdown so the plant could return to providing power to the grid. This paper will address some of the many technical and construction considerations required to perform this demolition and repair work safely, efficiently and in a short as possible duration.
机译:加压水反应器发电厂有时需要更换大型部件(蒸汽发生器称重750,000 IBS),这需要对原始设计期间无意中的工厂进行首次进行的第一次修改。 Tennessee Valley管理局蒸汽发生器更换项目(TVA's)Sequoyah核电站所需(1)在植物的盾构建筑屋顶(2'厚混凝土)中的两个大型临时开口(21'X45')通过水力爆破以允许去除旧发电机和安装的安装,(2)拆除和修复混凝土蒸汽发生器外壳屋顶(20英尺直径,3'厚),用电线锯切割除去(3)抗震鉴定;广泛的环形基础的设计与构建;使用世界上最大的起重机之一通过屋顶拆下这些组件。这种去除和更换过程必须以迅速的方式进行,以最小化植物关闭的时间量,因此工厂可以返回给电网的电力。本文将解决执行此拆除和维修工作所需的许多技术和施工考虑,以便在尽可能持续时间内安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号