首页> 外国专利> STEAM GENERATOR OPERATING PROCESS IN HORIZONTAL-BANK NUCLEAR STEAM GENERATING PLANT OF NUCLEAR STATION POWER UNIT

STEAM GENERATOR OPERATING PROCESS IN HORIZONTAL-BANK NUCLEAR STEAM GENERATING PLANT OF NUCLEAR STATION POWER UNIT

机译:核电站卧式核电站蒸汽发生器的运行过程

摘要

FIELD: power engineering; double-circuit nuclear power stations incorporating pressurized water reactor and steam-generating plant. SUBSTANCE: operating process of steam generator divided into several separate circulating loops includes coolant circulation over loop communicating with horizontal tube bank through main circulating pump, feedwater supply to tube space, steam discharge, continuous blowdown including blowdown water discharge and periodic blowdown for slime removal made during shutdown of power unit with loops being disconnected in succession; in the process blowdown water is discharged from steam generator of disconnected loop upon equalizing coolant temperature at steam-generator inlet and outlet in maximal slime accumulation zone located in bottom part of steam generator near coolant outlet. EFFECT: improved design. 2 cl, 1 dwg
机译:领域:电力工程;装有压水堆和蒸汽发生装置的双回路核电站。实质:蒸汽发生器的运行过程分为几个独立的循环回路,包括冷却液循环通过主循环泵与水平管束连通的循环回路,给管空间的给水供应,蒸汽排放,包括排污水的连续排污和定期排污以去除粘液在功率单元关闭期间,回路连续断开;在此过程中,通过平衡位于蒸汽发生器底部靠近冷却剂出口的最大粘液积聚区中的蒸汽发生器进口和出口处的冷却剂温度,可以从断开回路的蒸汽发生器中排出排污水。效果:改进的设计。 2厘升,1载重吨

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号