首页> 外文会议>International Commission on Irrigation and Drainage;International congress on irrigation and drainage >FINANCIAL REMODELING TO MEET THE ECONOMIC CHALLENGES IN WATER SECTOR OF EGYPT
【24h】

FINANCIAL REMODELING TO MEET THE ECONOMIC CHALLENGES IN WATER SECTOR OF EGYPT

机译:进行财务重塑以应对埃及水行业的经济挑战

获取原文

摘要

Most of the capital and operation & maintenance costs for irrigation and drainage system arefi nanced by the Egyptian government through the Ministry of Water Resources and Irrigation(MWRI). Currently, there is an urgent need to remodel some of the fi nancial models anddevelop new cost recovery ideas for the maintenance of the irrigation and drainage systems.Through this paper, some daring ideas are presented, which potentially could contribute inmitigating the economic challenges of the water sector of Egypt.MWRI conducts a yearly maintenance program for irrigation and drainage systems to properlyutilize the allocated amount of water and improve the hydraulic performance and conveyanceeffi ciency of the system. This requires remodeling and dredging of both irrigation and drainagechannels. The disposal of the dredged material is a burden for MWRI because of cost andallocation for landfi ll area. At the same time, there is a shortage of fi lling material in manyprojects like improvement irrigation project and bank stability projects. The fi rst idea is tomake use of the dredged material, which could be a valuable resource if recycled to meetthe demand of fi lling material in some projects. This will reduce the cost of the maintenanceprogram for irrigation and drainage systems. Discharge of industrial and domestic effl uent,which includes high suspended matter, into surface drains would cause high sedimentationrate and therefore, requires remodeling of the drain cross section more frequently thanplanned. Consequently, the second idea is to enforce monthly fees as part of the licensepermission for any effl uents discharging into the surface drain (Polluter Pay Principle). Thefees will be used to improve the drain system hydraulic performance and improve the waterfront of the drain and thus improving catchment landscape.
机译:灌溉和排水系统的大部分资金,运营和维护成本为 由埃及政府通过水资源与灌溉部资助 (MWRI)。当前,迫切需要重塑一些财务模型,并 提出新的成本回收思路,以维护灌溉和排水系统。 通过本文,提出了一些大胆的想法,这些想法可能有助于 减轻埃及水务部门的经济挑战。 MWRI为灌溉和排水系统执行年度维护计划,以使其正常运行 利用分配的水量并改善水力性能和输送 系统的效率。这需要对灌溉和排水系统进行改造和疏ging 渠道。由于成本高昂,处置挖出的材料是MWRI的负担。 土地储备分配。同时,许多地方的填充材料短缺 改善灌溉项目和河岸稳定项目等项目。第一个想法是 利用挖出的材料,如果回收利用以满足这些要求,这将是一种宝贵的资源 在某些项目中填充材料的需求。这将减少维护成本 灌溉和排水系统程序。排放工业和家庭污水, 其中包括高悬浮物,进入地表排水会导致高沉降 率,因此需要比下水道更频繁地重塑排水横截面 计划。因此,第二个想法是强制将月租费作为许可证的一部分 允许将任何废水排入地表排水(污染付费原则)。这 费用将用于改善排水系统的水力性能和改善水 排水沟的前部,从而改善集水区景观。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号