A Comparison of Pre- and Post-2005 Sanctioned Gulf of Mexico Tension Leg, Semi-submersible, and Spar Floating Platforms

机译:2005年之前和之后批准的墨西哥湾张力腿,半潜式和晶石浮动平台的比较

获取原文

摘要

Between 2005 and 2010, three major events led to a significant increase in design demands of deepwaterfield developments in the Gulf of Mexico (GoM):1. Category 5 hurricanes Katrina and Rita (2005),2. The Macondo well blowout (2010), and30 The development of deeper, tighter, more remote reservoirsThese events have resulted in increased metocean criteria, new safety regulations and functionalrequirements associated with producing deeper, higher pressure and lower porosity reservoirs. This paperwill examine and contrast the design impacts on Tension Leg Platform (TLP), Semi-submersible and Sparfloating platforms before and after these events. The overall impact of these new requirements on topsides,hull, station-keeping and riser systems of recently sanctioned TLP, Semi-submersible and Spar platformswill be compared with pre-2005 sanctioned platform analogues to demonstrate the resulting impacts onplatform size and cost.Increased demands of post-2005 sanctioned GoM floating platforms have resulted in higher deckelevations, greater topsides payload, more robust station-keeping systems and larger hull displacements.Further, the feasibility of proven risers and well systems is challenged by the higher wave induced motionsassociated with greater design and survival sea-states and high pressure reservoirs. The design impacts ofpre- and post-2005 sanctioned TLPs (Mars A, Olympus), Semi-submersibles (Atlantis, Jack St. Malo) andSpars (Tahiti, Lucius) on topsides, hull, station-keeping and riser systems will be compared anddifferences explained.This paper will enable Operators and platform designers to:1. Appreciate the magnitude of impact on size and cost of floating platforms of post-2005 requirements,2. Understand the relative impacts on the three major hull types commonly used for GoM developments,and3. Update analogues and norms used in benchmarking and concept selection
机译:在2005年至2010年期间,三项重大事件导致深水设计需求显着增加 墨西哥湾(GoM)的油田开发: 1.卡特里娜飓风和丽塔飓风5类(2005年), 2. Macondo井喷事件(2010年),以及 30开发更深,更紧密,更偏远的水库 这些事件导致增加了海洋标准,新的安全规定和功能 与生产更深,更高压力和更低孔隙度的储层有关的要求。这篇报告 将检查并对比设计对张力腿平台(TLP),半潜式和Spar的影响 这些事件之前和之后的浮动平台。这些新要求对顶面的总体影响, 最近批准的TLP,半潜式和Spar平台的船体,车站维护和立管系统 将与2005年之前批准的平台类似物进行比较,以证明由此产生的影响 平台大小和成本。 2005年后批准的GoM浮动平台的需求增加,导致甲板更高 高度,更大的顶部有效载荷,更强大的站位保持系统和更大的船体位移。 此外,已证实的冒口和井系统的可行性受到更高的波浪感应运动的挑战。 与更大的设计和生存状态以及高压储层相关。设计的影响 在2005年之前和之后获得批准的TLP(Mars A,奥林巴斯),半潜式潜水器(Atlantis,Jack St. Malo)和 将比较顶部,船体,车站维护和立管系统上的翼梁(塔希提岛,卢修斯),并 差异解释。 本文将使运营商和平台设计人员能够: 1.赞赏2005年后需求对浮动平台的规模和成本的影响程度, 2.了解对GoM开发中常用的三种主要船体类型的相对影响, 和 3.更新基准测试和概念选择中使用的类似物和规范

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号