CAUSES OF CONSTRUCTION DELAYS FOR ENGINEERING PROJECTS IN THE MIDDLE-EAST: AN EGYPTIAN PERSPECTIVE

机译:中东工程项目施工延误的原因:埃及人的观点

获取原文

摘要

The construction industry in the Middle-East in general and in Egypt in particular has an important role in the economic growth of these countries. However, time overruns is a repetitive phenomenon in these construction industries. Very few studies addressed the causes of construction delays for construction projects in this area. This paper focuses on the causes of construction delays in the Egyptian construction industry. The first main objective of the research is to identify and rank the major causes of delays for engineering projects. The second main objective is to determine the party responsible for the main causes of delays. The research was conducted in three phases. The first phase included unstructured interviews with practitioners involved in the Egyptian construction industry. The second phase consisted of a survey for a sample of thirty-five (35) professional experts using a customized questionnaire. These experts represented the different parties of the construction industry; namely, the Contractor, the Employer, and the Consultant/ Project Manager. The third phase of the research covered the analysis of the data collected, in order to determine the frequency and ranking of the causes of delays. The analysis of the results also included the party responsible of the different causes. The results revealed that the causes of delays can be grouped into five (5) main categories: 1) Construction related causes 2) Managerial related causes 3) Political related causes 4) Financial related causes 5) Technical related causes The top 12 causes included 3 construction, 7 managerial, 1 political and 1 financial related causes. The contractor and the Employer were found to be responsible each of 5 of the top 12 causes. The remaining two were found to be the responsibility of a third party.The top 12 causes included 3 construction, 7 managerial, 1 political and 1 financial related causes. The contractor and the Employer were found to be responsible each of 5 of the top 12 causes. The remaining two were found to be the responsibility of a third party.
机译:总体而言,中东地区的建筑业尤其是埃及的建筑业在这些国家的经济增长中具有重要作用。但是,在这些建筑行业中,时间超支是一种重复现象。很少有研究解决该地区建筑项目施工延误的原因。本文着眼于埃及建筑业中建筑延误的原因。该研究的第一个主要目的是确定并分类工程项目延误的主要原因。第二个主要目标是确定造成延迟的主要原因的责任方。研究分三个阶段进行。第一阶段包括对埃及建筑业从业者的非结构化访谈。第二阶段包括使用定制的问卷调查对三十五(35)名专业专家的样本进行的调查。这些专家代表了建筑业的不同方面。即承包商,雇主和顾问/项目经理。研究的第三阶段包括对收集到的数据进行分析,以确定延迟原因的频率和等级。对结果的分析还包括对不同原因负责的一方。结果表明,延迟的原因可分为五(5)个主要类别:1)与施工有关的原因2)与管理相关的原因3)与政治相关的原因4)与财务相关的原因5)技术相关的原因包括前十二个原因3建筑,7个管理,1个政治和1个与财务相关的原因。发现承包商和雇主对前12个原因中的5个原因均负有责任。剩下的两个被发现是第三方的责任。前12个原因包括3个建筑,7个管理,1个政治原因和1个与财务相关的原因。发现承包商和雇主对前12个原因中的5个原因均负有责任。发现其余两个是第三方的责任。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号