OVERCOMING THE DILEMMA OF EARLY PRICING: A STUDY AND ANALYSIS OF TARGET PRICING USING IPD APPROACH

机译:克服早期定价难题:使用IPD方法进行目标定价的研究与分析

获取原文

摘要

From the earliest of times buyers of construction services have struggled with the best way to establish a fair price for construction work. Starting in the latter half of the 19th century owners increasingly sought fixed single prices, competitively bid, for their construction. This led to the growth of general contracting and the practice remained in force for over 100 years, until the owners once again intervened, tired of change orders, the opaqueness of the process and the constant disputes. They sought out new methods of pricing tied to new methods of project delivery. From the 1970's on experimentations led to various forms of construction management, to design-build and now more recently to radical methods of Integrated Project Delivery (IPD). All of these methods shared a common feature - the earlier involvement of contracting expertise with the purpose of having the builders as partners and advisors during the design phase. This was all very well but it created a pricing dilemma for the owners: how were they to be sure of obtaining a fair market price for their projects when the traditional providers of prices and those with the greatest knowledge of pricing, the general contractors, were now involved at a stage where designs were incomplete and any pricing given would be subject to numerous assumptions, hedged with conditions and often priced without competition. The aim of this research is to provide a brief overview of historical evolution of pricing and contracting methods, to investigate the challenges associated with early pricing in alternative delivery approaches, and to study and analyze if/how IPD addresses the challenge of obtaining and sustaining an early fair price for owners. To accomplish the goals, this research has conducted a literature review on early pricing practices, interviews with various institutional owners, general contractors, program managers, and lean institutes who have had experience with early pricing in alternative delivery methods and IPD approach.
机译:从最早的时候开始,建筑服务的购买者就一直在为建立公平的建筑价格而努力寻找最好的方法。从19世纪下半叶开始,业主开始越来越多地寻求固定的单价,以竞争性的价格竞标其建筑。这导致总承包业务的增长,并且这种做法一直有效超过100年,直到业主再次介入,厌倦了变更单,过程的不透明性和不断发生的纠纷。他们寻找与项目交付的新方法相关的新定价方法。从1970年代开始,试验导致了各种形式的施工管理,设计建造,以及最近的综合项目交付(IPD)激进方法。所有这些方法都有一个共同的特征-较早地参与承包技术,目的是在设计阶段使建造者成为合作伙伴和顾问。这一切都很好,但是却给业主带来了价格困境:当传统的价格提供者和最了解价格的提供者(总承包商)成为承包商时,他们如何确保为自己的项目获得公平的市场价格?现在涉及的阶段是设计不完整,给出的任何价格都将受到多种假设的影响,有条件套期保值,并且通常在没有竞争的情况下进行定价。本研究的目的是简要概述定价和订约方法的历史演变,调查与替代交付方式中的早期定价相关的挑战,并研究和分析IPD是否/如何解决获取和维持定价的挑战。业主的早期公允价格。为了实现这些目标,本研究对早期定价实践进行了文献综述,采访了在替代交付方式和IPD方法方面具有早期定价经验的各种机构所有者,总承包商,项目经理和精益机构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号