Reconstruction of Canadian National Railway Br. 173.20 over the Fox River Planning, Design and Construction Considerations Oshkosh, Wisconsin

机译:重建加拿大国家铁路关于福克斯河规划,设计和建设考虑因素的173.20,威斯康星州奥什科什

获取原文

摘要

The existing three-span single track Fox River Bridge at CN Railway M.P. 173.20, Neenah Subdivision, was in need of rehabilitation or reconstruction in order to support reliable service on CN's core line between Winnipeg to Chicago. Located in downtown Oshkosh, Wisconsin, the bridge supports train traffic carrying primarily grain, pot ash, sulfur and forest products. During peak grain season, 22 trains per day at an operating speed of 25 mph pass over the structure. The Fox River Bridge is located in close proximity to the popular Lake Winnebago, requiring the existing swing span to open over 1,600 times per year during the recreational boating season that lasts from May to late October each year. Due to the age of the existing bridge, limitations of load capacity and periodic operational problems throughout the years, CN decided to evaluate alternatives to rehabilitate or reconstruct the existing structure. In 2009, CN embarked on a Three Phase project to implement improvements at the Fox River Crossing, which culminated with the on-line replacement of the historic bridge that will be fully completed in Fall 2013. The Three Phase project consisted of: 1. Phase 1: Project Planning and Conceptual Design of recommended alternative, including a detailed inspection, rating and investigation of various alternatives for the reconstruction or replacement of the bridge, providing guidance for the recommended alternative and the basis for the National Environmental Policy Act (NEPA) documentation. 2. Phase 2: Preliminary Design, Final Design and NEPA documentation, including preliminary design and refinement of the Phase 1 recommended alternative, development of final design and construction documents, and the completion of the Environmental Assessment and procurement of all necessary permits in the environmentally sensitive area. 3. Phase 3: Complete reconstruction of the historic bridge on the existing alignment, including environmental constraints for drilled shaft construction, waterline capbeams, two separate 10-hour change-out windows for the new approach span installations and a 36-hour change-out window for the new movable span. To replace the existing 180' movable span and 2-150' fixed truss spans, a new span configuration on the existing alignment was designed consisting of a 147' rolling bascule span, 5-57' deck plate girder spans and one 40' deck plate girder span. To accommodate these new spans, 6 new piers supported on drilled shafts were required with modifications to the two existing abutments. This paper will detail the planning and design of the new structure, the agency coordination and permitting necessary to replace the historic swing span and adjacent fixed truss spans, and the construction challenges leading to the phased implementation of the new rolling lift bascule span which will be fully was installed during a 36-hour track window in August 2013.
机译:CN Railway M.P.的现有三跨单轨Fox River桥Neenah分区173.20需要进行修复或重建,以支持CN在温尼伯至芝加哥之间的核心线路上提供可靠的服务。这座桥位于威斯康星州奥什科什市中心,可为火车交通提供主要运载谷物,灰烬,硫磺和森林产品的服务。在粮食高峰季节,每天有22列火车以25英里/小时的运行速度驶过建筑物。福克斯河大桥(Fox River Bridge)紧邻广受欢迎的温尼巴哥湖(Lake Winnebago),在每年五月至十月下旬的休闲划船季节,每年需要打开的跨度超过1600次。由于现有桥梁的年代久远,承载能力的局限性以及多年来的周期性操作问题,CN决定评估替代方案以修复或重建现有结构。 2009年,CN着手进行了一个三阶段项目,以在福克斯河道口实施改进,并最终完成了对这座历史悠久的桥梁的在线更换,该桥将于2013年秋季全面完工。该三阶段项目包括:1.一期工程1:建议替代方案的项目规划和概念设计,包括对桥梁重建或更换的各种替代方案进行详细的检查,评级和调查,为推荐替代方案提供指导,并为《国家环境政策法》(NEPA)文档提供依据。 2.第2阶段:初步设计,最终设计和NEPA文件,包括第1阶段建议替代方案的初步设计和完善,最终设计和施工文件的开发,环境评估的完成以及在环境方面所有必要许可证的采购敏感区域。 3.阶段3:在现有路线上完全重建历史悠久的桥梁,包括钻井施工的环境限制,水线顶梁,新进场安装的两个单独的10小时更换窗口以及36小时的更换新的活动跨度的窗口。为了取代现有的180'活动跨度和2-150'固定桁架跨度,在现有路线上设计了一种新的跨度配置,包括147'滚动的基础跨度,5-57'的甲板大梁跨度和一个40'的甲板大梁跨度为了适应这些新的跨度,需要对6个新的墩支撑在钻孔的竖井上,并对现有的两个基台进行修改。本文将详细介绍新结构的规划和设计,更换历史性跨度和相邻固定桁架跨度所需的机构协调和许可,以及导致分阶段实施新滚动吊篮跨度的施工挑战。完全安装于2013年8月的36小时跟踪窗口中。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号