MONITORING PROCEDURES FOR THE APPLICATION OF THE CONCEPT OF PRE-ALLOCATION OF TOTAL FLOAT

机译:预先分配总浮存量概念的监测程序

获取原文

摘要

With the increasing complexity in construction projects, monitoring project schedule and managing projects effectively is becoming increasingly important. Most projects being deadline oriented, timely completion becomes a must. A schedule overrun is never predicted at the start of the project. As per the current scheduling practices, float is considered free. It is an expiring resource. To handle the issue of total float management more efficiently, a new concept of total float management is proposed as an effort towards a more fair and equitable system. This concept respects the dynamic nature of construction projects and recognizes float to be an asset for both parties. The new concept proposes to allocate float in the ratio 50:50 between the parties at the start of the project. Monitoring procedures were developed to facilitate monitoring a project schedule closely as well as help in keeping track of the allowable total float for the owner and the contractor.
机译:随着建设项目复杂性的提高,有效监控项目进度和有效管理项目变得越来越重要。大多数项目都以截止日期为导向,必须及时完成。在项目开始时永远不会预测进度超支。按照当前的调度惯例,float被认为是免费的。这是一种即将到期的资源。为了更有效地处理总流通量管理问题,提出了一种新的总流通量管理概念,以期建立一个更加公平和公正的制度。这个概念尊重建设项目的动态性,并认为浮动是双方的资产。新概念提议在项目开始时在各方之间以50:50的比例分配浮动。制定了监控程序,以便于密切监控项目进度,并帮助跟踪所有者和承包商的允许总浮动额。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号