首页> 外文会议>International Conference on Control, Decision and Information Technologies >Production floor layout using systematic layout planning in Can manufacturing company
【24h】

Production floor layout using systematic layout planning in Can manufacturing company

机译:使用制罐公司的系统布局计划进行生产车间布局

获取原文

摘要

This paper presents an analysis on a production shop floor layout of a Can manufacturing company and the application of a systematic layout planning (SLP) procedure as an approach to solve the production shop floor layout problem. The relationship between machines, operation activities and material flow are used to determine the optimal location of each machine. SLP technique has been employed to design the two alternative production shop floor layouts and compare the performance between new layout and present layout in terms of material flow distance, traveling time, and traveling cost. The existing production process was inefficient, showing bottlenecks. The alternative layouts were developed based on minimum distance traveled between each pair of machine. It improved the company existing layout by reduced total movement traveled in production for material handling. The measurements covered the actual sizes of the layout and machines, activities between machines, distance between machines, and material flow between machines in the company. The proposed procedure is illustrated to be a viable approach for solving production shop floor layout design problem through a real-world case study. From the proposed two alternative layouts which are more economical, distance of the production flow can be shortened from 389.7m to 311.2m or 360.6m. The traveling time can be reduced from 901sec. to 750sec. and traveling cost can be reduced from 3.17 Birr to 2.98 or 2.19 Birr per each travel resulting increase in productivity.
机译:本文对罐头制造公司的生产车间布局进行了分析,并应用了系统布局计划(SLP)程序作为解决生产车间布局问题的一种方法。机器,操作活动和物料流之间的关系用于确定每台机器的最佳位置。 SLP技术已被用来设计两种替代的生产车间布局,并在物料流距,运输时间和运输成本方面比较新布局和当前布局之间的性能。现有的生产过程效率低下,显示出瓶颈。根据每对机器之间的最小行进距离来开发替代布局。通过减少生产中用于物料搬运的总移动量,它改善了公司现有的布局。这些度量涵盖了布局和机器的实际大小,机器之间的活动,机器之间的距离以及公司中机器之间的物料流。通过实际案例研究,说明所建议的过程是解决生产车间布局设计问题的可行方法。从提议的两种更经济的布局中,生产流的距离可以从389.7m缩短到311.2m或360.6m。行驶时间可以从901秒减少。到750秒。每次旅行的旅行成本可以从3.17比尔降低到2.98或2.19比尔,从而提高了生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号