首页> 外文会议>Offshore Technology Conference >The Who Dat Development: Evolution of a Project from Lease Sale to First Production
【24h】

The Who Dat Development: Evolution of a Project from Lease Sale to First Production

机译:世卫组织DAT开发:从租赁出售到第一次生产项目的演变

获取原文

摘要

This paper provides an overview of the Who Dat development. The Who Dat field is located in the Mississippi Canyon protraction area of the Gulf of Mexico in blocks 503, 504 and 547 and is being developed using the OPTI-EX semisubmersible floating production system (FPS) which has a capacity of 60 MBOPD and 150 MMCFD. The Who Dat discovery is primarily oil and consists of ten stacked amplitude-supported reservoirs in a salt withdrawal mini-basin. Three wells have been drilled to date penetrating over 700' of net pay in nine distinct reservoirs ranging in depth from 12,000' to 17,000' TVD. The field will be developed with twelve subsea wells (i.e. wet trees) flowing to three subsea manifolds and subsequently to the FPS via two infield flowloops using flexible risers. The project includes a 10" gas export line and 14" oil export line also using flexible risers. The paper covers the exploration phase including evaluating the prospect prior to the lease sale and adjusting the delineation plan based on the discovery well. The paper also covers the development concept selection including the evolution of the project from a long subsea tieback to a new FPS, the challenges of utilizing an FPS that was built on a speculative basis (modifications required, regulatory approval), and contracting strategy (negotiation of an installment purchase and managing uncertainty in a post-Macondo environment). This development represents a number of firsts: first time that a private company will own an FPS, first time the OPTI-EX semisubmersible FPS will be used, first time an FPS has been approved for installation post-Macondo, first time an FPS has been built on speculation, and first time a field has gone from concept selection to installation of a new FPS in less than a year. The project's accelerated schedule created challenges since numerous items were on critical path, including items that are typically nowhere near critical path.
机译:本文概述了世界卫生组织的发展。世卫组织Dat Field位于墨西哥湾的密西西比峡谷灯具区域,墨西哥湾块503,504和547,正在使用具有60 Mbopd和150 mmcfd的容量的Opti-ex半浮动生产系统(FPS)开发。 DED Discovery主要是石油,由盐分迷你盆中的十个堆叠幅度支撑的储层组成。已经钻了三头井,迄今为止净化超过700美元,九个不同的水库中的净额超过12,000'至17,000英寸的TVD。该领域将用十二个海底井(即湿树)开发,其流到三个海底歧管,随后通过使用柔性立管通过两个infield流漏来到FPS。该项目还包括一个10“天然气出口线和14个”石油出口线,也使用柔性立管。本文涵盖了勘探阶段,包括在租赁销售之前评估前景,并根据发现良好调整划界计划。本文还涵盖了发展概念选择,包括从长期海底重建到新FPS的项目的演变,利用以投机基础(所需修改,监管批准)和收缩战略建立的FPS的挑战(谈判在Macondo环境中的分期付款和管理不确定性)。这个发展代表了一些第一款:第一次私营公司首次拥有FPS,首次使用Opti-ex半机器fps,首次批准FPS后麦肯科的安装,第一次是FPS建立在猜测中,第一次出现在概念选择中,在不到一年的时间内安装新的FP。该项目加速的时间表创造了挑战,因为许多项目在关键路径上,包括通常在关键路径附近的物品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号