首页> 外文会议>International conference on artificial intelligence >Generation Expansion Planning base on Modified Shuffled Frog Leaping in Restructured Environment
【24h】

Generation Expansion Planning base on Modified Shuffled Frog Leaping in Restructured Environment

机译:重组环境下基于改进的蛙跳技术的发电扩展计划

获取原文

摘要

In this paper a generation expansion planning in restructured power systems is presented based on Modified Shuffled Frog Leaping (MSFL) for decoupling generation expansion planning from transmission expansion planning. Also for reducing complexity of the problem the benders decomposition is applied in this paper which divide the main problem in to two sub-problems as; maximize profits of each GENCO (PBGEP) and the security problem wants to satisfy security network constraints (SCGEP). Accordingly, calculate value of each GENCO's profit and total profit are considered as an optimization problem by proposed MSFL. The effectiveness of the proposed technique is applied over modified IEEE 30-bus system. The presented results demonstrate the efficiency the proposed technique.
机译:在本文中,提出了一种基于改进的改组蛙跳(MSFL)的重组电力系统中的发电扩展计划,用于将发电扩展计划与输电扩展计划分离。为了降低问题的复杂性,本文还应用了弯头分解,将主要问题分为两个子问题:最大化每个GENCO(PBGEP)的利润,并且安全问题想要满足安全网络约束(SCGEP)。因此,建议的MSFL将每个GENCO利润和总利润的计算值视为优化问题。所提出的技术的有效性在改进的IEEE 30总线系统上得到了应用。提出的结果证明了所提出技术的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号