首页> 外文会议>International topical meeting on probabilistic safety assessment and analysis >USE OF SEISMIC PRA FOR RISK-INFORMED DECISION MAKING BY UTILITIES AND REGULATORY AGENCIES
【24h】

USE OF SEISMIC PRA FOR RISK-INFORMED DECISION MAKING BY UTILITIES AND REGULATORY AGENCIES

机译:地震证券对公用事业和监管机构的风险信息决策

获取原文

摘要

The methodology for seismic PRA (SPRA) has existed for over three decades, over which time it has evolved and matured, like the rest of PRA. It has been applied at several dozen nuclear power plants worldwide. SPRA has been used to support risk-informed decision-making to upgrade the safety of existing plants, to help prioritize which proposed backfits are most urgent, to help regulatory agencies like he USNRC and international agencies like the IAEA to develop regulations and regulatory guidance related to seismic risk, to support the prioritization of safety research projects, and to develop insights into the overall seismic risk from an individual plant and from an entire fleet of plants. In this latter role, it has been the principal vehicle for informing decision-makers and the general public about the risk from earthquakes at a typical nuclear plant. What emerges from the ensemble of SPRAs is that typically the seismic part of the overall reactor risk is a major contributor, sometimes dominant, almost always important, although sometimes negligible. However, seismic PRA is subject to a major misconception on the part of some PRA analysts who can be heard continuing to profess the view that SPRA is not mature enough for routine use for risk-informed applications. This view is inconsistent with the current status of the SPRA methodology and its uses in regulatory and plant-specific applications. This paper describes the evolution of the SPRA methodology and its components, and provides examples of some specific applications.
机译:地震PRA(SPRA)的方法已经存在超过三十年,其中它已经进化和成熟,就像PRA的其余部分。它已在全球几十名核电站应用。 SPA已被用来支持风险信息的决策,以提升现有植物的安全,以帮助优先考虑提出的背景是最迫切的,帮助像IAEA等国际机构这样的监管机构制定条例和监管指导抗震风险,支持安全研究项目的优先级,并开展对单个植物的整体地震风险以及整个植物舰队的洞察。在后一职责中,它是通知决策者和公众关于典型核电站地震风险的主要车辆。 SPRAS的集合出现的是,通常,整体反应堆风险的地震部分是一个主要的贡献者,有时占主导地位,几乎总是重要的,尽管有时可以忽略不计。然而,地震PRA受到一些PRA分析师的主要误解,他们可以听到持续公告SPRA不够成熟,足以用于常规用于风险信息的申请。此视图与SPRA方法的当前状态不一致及其在监管和植物特定应用中的用途。本文介绍了SPRA方法及其组件的演变,并提供了一些特定应用的示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号