DEVELOPMENT OF ENTERGY FLEET PSA GUIDANCE DOCUMENTS FOR MODEL DEVELOPMENT

机译:开发肠贯舰队PSA指导文件的模型开发

获取原文

摘要

Entergy Nuclear is a large diverse nuclear fleet that consists of nine nuclear sites and two regional headquarters offices. The PSA models for these plants were generally developed and maintained separately until the early 2000's. Therefore, much of the organizational learning and best practices from one site were not implemented at another site due to time constraints, plant demands, lack of communication, or lack of expertise. In 2007, Entergy Nuclear management requested that guidelines be developed to standardize PSA processes and to better address the requirements of the ASME PSA Standard. Twelve guidelines were scheduled to be developed. These guides were based on the nine major Full Power Internal Events (FPIE) ASME Standard elements with additional guidelines for Loss of Offsite Power analyses, Risk Monitor development, and Uncertainty Analysis. The majority of these guidelines were scheduled to be completed by the end of 2008. These guidelines had to be developed while still meeting the model update schedules, IPEC License Renewal, and various plant PSA applications. In addition to the compressed schedule for developing these guidelines, the completion of these reports were complicated by other factors. The amount of detail necessary for the guidelines was a significant challenge. More detail would likely force some plants to make major changes to the models or the documentation with unacceptable impacts on model update schedules. However, some amount of detail is necessary to help new PSA engineers in performing these tasks. The PSA software tools were generally consistent across the sites (all sites use CAFTA for fault tree modeling). However, other methodologies and tools varied throughout the fleet. These variations are acceptable within the ASME Standard and had to be accounted for in the guidelines. Despite the compressed schedule and the significant challenges and compromises necessary, the PSA guidelines were able to be completed and have been useful to both the experienced and new PSA engineers across the Entergy Nuclear fleet. The guideline development has also fostered more cooperation between the two regional offices and has led to more discussions and sharing of information across the fleet.
机译:Entergy核是一个大型多样化的核舰队,包括九个核网站和两个区域总部办公室。这些植物的PSA模型通常是开发和维持直到2000年初。因此,由于时间限制,植物需求,缺乏沟通或缺乏专业知识,在另一个网站上没有在另一个网站实施的大部分组织学习和最佳实践。 2007年,Entergy核管理要求制定指导方针以规范PSA流程,并更好地解决ASME PSA标准的要求。计划开发十二条指南。这些指南基于九个主要全电源内部事件(FPIE)ASME标准元素,具有额外的办事处权力分析,风险监测发展和不确定性分析的准则。这些指南中的大部分计划于2008年底完成。必须在仍在符合模型更新时间表,IPEC许可续订和各种工厂PSA应用程序的同时制定这些准则。除了制定这些指导方针的压缩时间表外,这些报告的完成对其他因素复杂化。指南所需的详细资料是一个重大挑战。更详细的情况可能会强制一些工厂对模型或对模型更新计划的不可接受的影响进行重大更改。但是,有必要的详细信息有助于帮助新的PSA工程师执行这些任务。 PSA软件工具通常在站点上一致(所有站点使用CAFTA用于故障树建模)。然而,其他方法和工具在整个舰队中变化。在ASME标准中,这些变化是可接受的,并且必须在指南中占用。尽管采取了压缩的时间表和必要的重大挑战和妥协,但PSA指南能够完成,并且对肠核舰队的经验丰富和新的PSA工程师有用。该指南开发还促进了两个区域办事处之间的更多合作,并导致更多讨论和分享整个舰队的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号