首页> 外文会议>IEEE International Conference on Granular Computing >Risk element transmission prediction model of grid infrastructure project capital flow
【24h】

Risk element transmission prediction model of grid infrastructure project capital flow

机译:电网基础设施项目资金流的风险要素传递预测模型

获取原文
获取外文期刊封面目录资料

摘要

Since participants involved in a grid infrastructure project are a community of interests, we should not focus only on a party's internal risk. Based on risk element transmission theory, this paper studies risk transmission process of capital flow among the participants involved in a grid infrastructrue project. This paper indentifies the inventory time and accounts receivable as risk elements based on the capital flow diagram, predicts the value of inventory time risk element by using gray system model, analyzes accounts receivable risk element which follows Poissionian distribution and under the influence of inventory time, and thereby establishes a model which describes the risk transmission along project capital flow. Combined with practical an example of the grid infrastructure project, this paper quantitatively analyzed the transmission of funding risks among enterprises involved in a grid infrastructrue project, and confirmed the validity of the model.
机译:由于参与网格基础设施项目的参与者是利益共同体,因此我们不应仅关注一方的内部风险。本文基于风险要素传导理论,研究了网格基础设施项目参与者之间资本流动的风险传导过程。本文根据资金流向图确定了存货时间和应收账款作为风险要素,通过灰色系统模型预测了存货时间风险要素的价值,分析了遵循泊松分布并受存货时间影响的应收账款风险要素,从而建立了一个模型,描述了沿着项目资本流动的风险转移。结合实际的网格基础设施项目实例,定量分析了网格基础设施项目所涉及的企业之间资金风险的传递,并验证了该模型的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号