首页> 外文会议>IEEE Power and Energy Society General Meeting >Research on the technology of ultra-long power supply in low voltage for tunnel construction
【24h】

Research on the technology of ultra-long power supply in low voltage for tunnel construction

机译:隧道超低压低压超长供电技术研究

获取原文

摘要

Voltage drop in the cable line is a significant problem in today's ultra-long low voltage power supply system. It caused the problem that electricity demands of the system and the requirement of transmission distance cannot be fulfilled. The technique that imports 10 kV or 35 kV class Voltage into the tunnel has been used as the solution. But it extends the project cycle, largely increases the budget and brings security concerns. The paper analyses the 400 V long distance power supply problem and compares reactive power compensation devices through Matlab/Simulink simulations, such as the shunt capacitor, SVC (Static Var Compensator), STATCOM (Static Synchronous Compensator) and OCC-STATCOM. The OCC-STATCOM demonstrates better capacity of real-time power load tracking and shows higher transmission power in the construction. The paper also does OCC-STATCOM correction based on real projects.
机译:在当今的超长低压电源系统中,电缆线中的电压降是一个重大问题。造成了系统用电需求和传输距离需求无法满足的问题。解决方案是使用将10 kV或35 kV类电压输入隧道的技术。但是它延长了项目周期,大大增加了预算并带来了安全隐患。本文分析了400 V长距离电源问题,并通过Matlab / Simulink仿真比较了无功功率补偿设备,例如并联电容器,SVC(静态无功补偿器),STATCOM(静态同步补偿器)和OCC-STATCOM。 OCC-STATCOM展示了更好的实时功率负载跟踪能力,并在建筑中显示出更高的传输功率。本文还基于实际项目进行了OCC-STATCOM校正。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号