首页> 外文会议>IEEE Power and Energy Society General Meeting >Integrating demand-side resources into distribution system planning: A proposal under commercial energy service environment
【24h】

Integrating demand-side resources into distribution system planning: A proposal under commercial energy service environment

机译:将需求方资源整合到配电系统规划中:商业能源服务环境下的建议

获取原文

摘要

Coordinating electricity sales with DSM implementation at planning stage after the integration of commercial energy services have become a significant issue for the decision-makers of utilities. Under this background, a novel Grid-side Integrated Resource Planning (GIRP) paradigm is proposed in this paper. Through the identification of key elements induced by the energy service and the interdependence of decision-making of the main grid and its affiliated energy service companies (ESCOs), a bilevel coordinated planning model is developed to achieve globally optimal investment by making use of the synergetic effect. A bee colony complementary hybrid algorithm (BCCA) is also proposed by introducing nonlinear complementarity function to tackle the inefficiency of solving bilevel optimization problems. The results of case study indicate the superiority of GIRP in terms of its better economic benefits and environmental effects and also the improved efficiency of the proposed algorithm.
机译:在商业能源服务整合之后,在计划阶段将电力销售与DSM实施相协调已成为公用事业决策者的重要问题。在此背景下,本文提出了一种新颖的网格侧集成资源规划(GIRP)范式。通过识别由能源服务引起的关键因素以及主电网及其附属能源服务公司(ESCO)决策的相互依存关系,开发了一种双层协调计划模型,以利用协同效应实现全球最佳投资影响。通过引入非线性互补函数,提出了蜂群互补混合算法(BCCA),以解决求解双层优化问题的效率低下的问题。实例研究结果表明,GIRP在其更好的经济效益和环境影响方面具有优越性,并且还提高了所提算法的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号