首页> 外文会议>Construction research congress >Is the Information Available from Historical Time Series Data on Economic, Energy, and Construction Market Variables Useful to Explain Variations in ENR Construction Cost Index?
【24h】

Is the Information Available from Historical Time Series Data on Economic, Energy, and Construction Market Variables Useful to Explain Variations in ENR Construction Cost Index?

机译:从经济,能源和建筑市场变量的历史时间序列数据中获得的信息是否有助于解释ENR建筑成本指数的变化?

获取原文

摘要

Engineering News Record (ENR) publishes Construction Cost Index (CCI) monthly. CCI is widely used by cost engineers for preparing cost estimates, bids, and budgets for capital projects. CCI is subject to significant variations. The information available from historical time series data on some economic variables (federal funds rate, consumer price index, gross domestic product and unemployment rate), energy-related variable (crude oil price), and construction market variables (housing starts, employment level in construction, and construction spending) may be useful for explaining CCI variations. The research objective of this paper is to empirically examine whether the time series information on the above economic, energy, and market variables is useful to explain CCI variations. We devise time series tests like Pearson correlation test and Granger causality test to statistically examine the impact of each variable on CCI variations over time. The results show that the information available from historical data on consumer price index, gross domestic product, crude oil price, housing starts and employment level in construction is useful to explain variations of CCI. It is concluded that the information available from historical data on federal funds rate, unemployment rate, and construction spending do not have power to explain CCI variations. This empirical study is expected to increase our understanding about the impact of various economic, energy, and construction market variables on CCI variations. It is anticipated that this knowledge will be useful for cost estimators and capital project planners to explain changes in construction cost over time.
机译:工程新闻记录(ENR)每月发布建设成本指数(CCI)。成本工程师广泛使用CCI来为基本建设项目准备成本估算,投标和预算。 CCI可能会有很大的变化。可从历史时间序列数据中获得的信息,包括一些经济变量(联邦基金利率,消费物价指数,国内生产总值和失业率),与能源有关的变量(原油价格)和建筑市场变量(住房开始,美国的就业水平)建筑和建筑支出)可能有助于解释CCI的变化。本文的研究目标是通过经验检验上述经济,能源和市场变量的时间序列信息是否对解释CCI变化有用。我们设计了时间序列检验,例如Pearson相关检验和Granger因果检验,以统计方式检验每个变量对CCI随时间变化的影响。结果表明,从消费者价格指数,国内生产总值,原油价格,房屋开工和建筑业就业水平的历史数据中获得的信息有助于解释CCI的变化。结论是,从联邦资金利率,失业率和建筑支出的历史数据中获得的信息无权解释CCI的变化。期望通过这项经验研究来加深我们对各种经济,能源和建筑市场变量对CCI变化的影响的理解。可以预计,这些知识将有助于成本估算人员和资本项目计划人员解释建筑成本随时间的变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号