首页> 外文会议>ISSMGE Technical Committee TC 211 international symposium on ground improvement >Realization of a railway enlargement in unstable excavations alongside the existing line at Dilbeek (Belgium)
【24h】

Realization of a railway enlargement in unstable excavations alongside the existing line at Dilbeek (Belgium)

机译:与比利时迪尔贝克(Dilbeek)的现有线路一起在不稳定基坑中实现铁路扩建

获取原文

摘要

Within the framework of the regional express network around Brussels, two new railway tracks will be added besides two existing tracks linking Brussels to Ghent. The existing railway link crosses a valley with a geotechnical complex lithography. This complexity and the existing slopes beside the railway link up to 20m deep, had an in important influence on the design of the railway enlargement. Based on historical information and the detailed soil investigation the design is done with respect for the existing soil improvement measures taken in the past and the scope of the project. The design includes slope stability measures such as soil nailing, tieback anchors, construction elements with a secant pile wall and hydraulic measures to avoid water overpressure on the construction. The design of the construction will be discussed in detail as well as the first monitoring results of the movements and the anchor forces of the construction during execution.
机译:在布鲁塞尔周围的区域快递网络的框架内,除了现有两条连接布鲁塞尔和根特的轨道外,还将增加两条新的铁路轨道。现有的铁路线通过岩土复杂的光刻技术穿越山谷。这种复杂性和长达20m的铁路连接线旁的现有斜坡对铁路扩建的设计产生了重要影响。根据历史信息和详细的土壤调查,在考虑到过去采取的现有土壤改良措施和项目范围的基础上进行设计。设计包括斜坡稳定措施,例如土钉,回锚,带有割线桩墙的建筑构件以及避免水压过高的水力措施。将详细讨论建筑的设计,以及施工期间运动和锚固力的第一个监视结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号